3.1 Robot Installation Overview
Tool Flange Installation Procedure
3.4 Installing the Front Panel
3.5 Installing User-Supplied Safety Equipment
Remote Pendant Signals on the XMCP Connector
E-Stop Circuits on XUSR and XFP Connectors
Remote High Power ON / OFF Control
Using a User-Supplied Control Panel
3.6 Setting the EtherCAT Node ID
Setting the EtherCAT Node ID Using Hardware Switches
Chapter 4: System Cable Installation
XBELT IO Belt Encoder Y Adapter Cable
4.2 Connecting Digital I/O to the System
Digital I/O Signal Configuration
4.3 Connecting the 24 VDC Cable to the Robot
Making the 24 VDC Power Supply Cable
4.4 Connecting 200-240 VAC Power Cable
Making the 200-240 VAC Power Supply Cable
Connecting the AC Power Supply Cable
4.5 Grounding the Robot System
Grounding Robot-Mounted Equipment
Chapter 5: Optional Equipment Installation
4
eCobra 600 and 800 Robots with EtherCAT
24402-000 Rev B