Initial steps using the NNCLI
The initial commissioning steps involve basic setting configuration.
Prerequisites to initial steps
•
You must install the hardware.
•
You must install at least one cable to set up a remote connection to
the switch.
•
You must power up the switch.
Initial commissioning procedures
The following task flow shows the sequence of procedures you perform
for the initial commissioning steps. To link to a procedure, click on the
procedure title in
“Initial commissioning navigation” (page 71)
.