11.
Tighten the screw while pressing the top of the fitting lightly.
Screw
Figure 4-20 Securing the Fitting
12.
Make sure that the power switch of the new power supply unit is set to OFF and that
the power cord is unplugged.
13.
Insert the new power supply into the slot with the ejector opened, and push it to the
innermost.
Figure 4-21 Inserting the New Power Supply Unit
4-14 Problem
Solving
Содержание VERSA S1300 Series
Страница 1: ... U s e r s G u i d e NEC Storage S1300 ...
Страница 2: ......
Страница 4: ......
Страница 8: ...vi Contents ...
Страница 18: ...xvi Using This Guide ...
Страница 19: ...1 System Overview Overview System Chassis System Features ...
Страница 54: ...A B Figure 2 3 Installing the Rack Mounting Kit 2 6 Setting Up the System ...
Страница 73: ...3 Upgrading the System Overview Adding Hard Disk Drives Adding Disk Enclosures ...
Страница 86: ...3 14 Upgrading the System ...
Страница 107: ...A Appendix Technical Specifications Creating a Logical Disk How to Change the Topology and Data Transfer Rate ...
Страница 114: ...A 8 Appendix ...
Страница 117: ...xx ...
Страница 118: ... ...