5-14
MAIN CONTROL PCB
Note:
Before changing the main control PCB, back up the user data (such as one-touch dial numbers).
Note:
When installing the new main control PCB:
For F-360: Confirm the JP3 and JP4 on the new main control PCB are set to ON.
For F-320: Confirm the JP2 and JP5 on the new main control PCB are set to ON.
1. Remove the rear cover, top rear cover and upper cover. (See page 5-7.)
2. Remove four shield plate mounting screws.
3. Disconnect all connectors on the main control PCB.
4. Remove the main PCB mounting screws, and then remove the MAIN CONTROL PCB.
Note:
The F-320 model doesn’t have the SUB-MAIN CONTROL PCB.
Main control PCB
Sub-main control PCB
Shield plate
Содержание F-360
Страница 12: ...2 1 Section2 Machine Composition 2 1 F 360 Interconnect Block Diagram...
Страница 13: ...2 2...
Страница 14: ...2 3 F 320 Interconnect Block Diagram...
Страница 254: ...6 29 13 Attach the paper tray of the 2 Bin unit...