3 Operating Procedures
3.1 Overview
The following list provides an overview of the basic operating procedures required before
using the system.
1 Start up the system.
Turn on the power to the instrument and then the computer (if they are not already on).
Launch the SOFTmax PRO application software.
2 Check the temperature or turn on the incubator.
View the Control Panel and note the temperature inside the reading chamber.
Use the control panel to turn on the incubator, if it is required by your experiment.
It
may take a while for the temperature to stabilize, so do this before configuring other
instrument parameters.
Note:
Incubator settings can also be set using SOFTmax PRO.
3 Configure instrument settings using
SOFTmax PRO.
Configure the read mode, type of analysis, template, etc., as desired. Create sections
(Notes and Plates) as needed in the Experiment Section of the Software window.
4 Load prepared pipette tip rack and microplates into drawers.
Load prepared racks and microplates into the drawers. Use drawer adapters as needed.
5 Begin
reading.
Using SOFTmax PRO, start the reading.
Detailed instructions for these and other procedures are located in the following sections
of part 3.
44
FlexStation II Operator’s Manual – Rev. D
Содержание FlexStation II
Страница 6: ...FlexStation II Operator s Manual Rev D vi ...
Страница 92: ...4 Applications 86 FlexStation II Operator s Manual Rev D ...
Страница 102: ...5 Service and Maintenance Procedures 96 FlexStation II Operator s Manual Rev D ...
Страница 124: ...6 Troubleshooting Procedures 118 FlexStation II Operator s Manual Rev D ...
Страница 134: ...7 Appendices 128 FlexStation II Operator s Manual Rev D ...