2.2 Unpacking the System
c
Squeeze the tabs together and pull outward. The tabs should pivot up and out, and
the whole clip should come out.
4
Remove the upper shipping carton and the upper foam.
5
Open the twist tie at the top of the plastic bag (enclosing the instrument) and slide the
bag down out of the way, around the base of the detection module.
6
Together with another person, reach inside the bag and under the instrument. Lift the
instrument out of its shipping tray (the bottom of the carton) and place it on the bench.
Warning!
The FlexStation II instrument weighs approximately 55 pounds and should be
lifted with care. It is recommended that two persons lift the instrument together, taking
proper precautions to avoid injury.
7
Set shipping materials out of the way.
Removing Shipping Screws
1
There are two shipping screws holding down the cover of the instrument. Locate these
stainless steel screws under the front flange of the detection module.
actual˚C
set pt˚C
Set Temp
Temp
on/off
Drawers
reading
chamber
reagents
tip rack
Shipping Screws (captive)
Location of Shipping Screws
2
Unscrew the shipping screws with the Allen wrench. It may be necessary to move the
instrument to the front of the bench to reach the screws from below. The screws remain
captured in the base.
FlexStation II Operator’s Manual – Rev. D
33
Содержание FlexStation II
Страница 6: ...FlexStation II Operator s Manual Rev D vi ...
Страница 92: ...4 Applications 86 FlexStation II Operator s Manual Rev D ...
Страница 102: ...5 Service and Maintenance Procedures 96 FlexStation II Operator s Manual Rev D ...
Страница 124: ...6 Troubleshooting Procedures 118 FlexStation II Operator s Manual Rev D ...
Страница 134: ...7 Appendices 128 FlexStation II Operator s Manual Rev D ...