8 OPR CONTROL
8.3 Fast OPR control
8.3.1 Outline of the fast OPR control operation
Fast OPR operation
In a fast OPR control, positioning control is carried out by a "machine OPR control"
to the "Md. 1 Current feed value" stored in the QD70.
By setting "9001" in " Cd. 3 Start method" and turning ON the positioning start signal
(Y8 to YF), fast OPR control performs position control at high speed without using
the positioning data and near-point dog, zero and other signals.
The following is the operation performed at a "fast OPR control" start.
1) Set "9001" in " Cd. 3 Start method" and turn ON the positioning start signal (Y8
to YF).
2) Position control is started to reach "Md. 1 Current feed value" according to the
OPR data ( OPR. 1 to OPR. 9 ) defined when machine OPR control was carried
out.
3) "Fast OPR control" is completed.
OPR.4 OPR speed
Position set up by machine OPR control
(OP)
Fast OPR control start
(Positioning start signal: Y8 to YF)
Md.4 Axis operation status
Standby
Fast OPR in progress
M
OP
Position control to OP
Pr.6 Bias speed at start
Standby
Fig. 8.12 Fast OPR control
Precautions for operation
(1) Start fast OPR control after setting up the machine OP by exercising machine
OPR control.
If fast OPR control is started without machine OPR control being exercised, the
"Machine OPR not execute" error (error code: 203) will occur.
(2) In fast OPR control, the "OPR compete flag" (Md. 7 Status: b1) and "Md. 2
Movement amount after near-point dog ON" are unchanged.
(3) On completion of fast OPR control, "OPR. 3 OP address" is not stored into
"Md. 1 Current feed value".
Содержание GX Configurator-PT
Страница 13: ...MEMO SECTION 1...
Страница 127: ...7 20 7 20 MELSEC Q 7 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO...
Страница 129: ...MEMO SECTION 2...
Страница 221: ...Index 5 Index 5 MEMO...