
60
|
PROVENO E
Rev. 1.2 (24.08.2016)
Installation
1. Tilting lever
2. Mounting plate of limit switches
3. Limit switch for cooking position
4. Limit switch of tilting end position
5. Locking nut for adjustment
4
3
1
5
2
5.7.2. Fastening the mixer motor cover box
On the large kettle models (Proveno 150, 200, 300, 400), the cover box of the mixing motor comes unat-
tached inside the kettle. The cover box is fastened after installation by using the screws supplied while
the kettle is in a tilted position.
5.8. First run and testing
The following checks must be performed after the installation before taking the Proveno combi-kettle
into regular use.
5.8.1. Filling the steam generator
The steam generator of the Proveno combi-kettle is empty of water on delivery. When the combi-kettle
is started for the fi rst time after installation, the steam generator is automatically fi lled. After fi rst run,
the combi-kettle automatically checks and maintains the correct water amount in the steam generator.
• First check that the closing valves coming to the kettle are in the ON position and the kettle’s mains
switch is in position ON.
• Switch the kettle on with the ON/OFF button. After initial check, the red indicator lights inside the
triangle on both sides of the ON/OFF button illuminate to indicate low water level.
• Check that the kettle section is in the cooking position by pressing the tilting reverse button.
• Filling the steam generator of the combi-kettle can take several minutes, depending on the kettle size.
When the correct water level has been achieved, the red indicator lights go off.
5.8.2. Checking the safety block
The Proveno combi-kettle is equipped with a four-phase safety block. Testing the block is performed in
the way described below. NOTE: Values in brackets concern combi-kettle versions with a max. setting
temperature of 110°C.
It is not allowed to stand behind the kettle during the safety block check, because, when the check is
completed, the safety valve at the kettle’s rear edge opens, blowing hot steam out of the kettle. The
kettle must be clean and empty.
• Switch the kettle on, set the temperature to a max. value of 120°C (110°C) and wait until the kettle
heats up to the set value and heating stops (phase 1 tested).
• Stop the heating function by pressing
until ’On’ appears on the display.
Содержание PROVENO E
Страница 4: ...4 PROVENO E Rev 1 2 24 08 2016 ...
Страница 68: ...68 PROVENO E Rev 1 2 24 08 2016 Technical specifications 8 Technical specifications ...
Страница 71: ... 71 PROVENO E Rev 1 2 24 08 2016 Technical specifications ...
Страница 72: ......