- 82 -
U.motion KNX Server Plus, Touch
Installation Manual
An example of a SCENARIO with defined actions can be seen in the following screenshot:
9.4
S
CENARIOS WITH
W
AIT
C
OMMANDS
It is possible to create a delay between the individual actions of a SCENARIO using WAIT COMMANDS, which cause the
SCENARIO to pause for a certain period of time. Thus makes it is possible to shift the various actions of a SCENARIO in
time.
The WAIT COMMANDS are objects, which are added to the area "ACTIONS EXECUTED FROM THE SCENARIO” just like
KNX objects. For adding a WAIT COMMAND, search for the keyword “wait” with the search function and pull the desired
WAIT COMMAND into the desired position of the area ("drag and drop”). In U.motion KNX Server Plus Touch the
following waiting times are available:
•
1 second
•
2 second
•
5 second
•
10 second
•
15 second
•
20 second
•
30 second
•
1 minute
•
2 minutes
•
5 minutes
The WAIT COMMANDS can be found through the search function, by searching for the keyword “
wait
”.
•
10 minutes
•
15 minutes
•
20 minutes
•
30 minutes
•
1 hour
•
2 hours
•
3 hours
•
6 hours
•
12 hours
•
24 hours