SECTION 4
OPERATOR MAINTENANCE
87
PRINTER MAINTENANCE SCHEDULE
General, periodic maintenance is needed to keep the Printer in good working order. Many tasks can be
performed by operators with basic supplies, no special tools needed. Other tasks should only be performed
by trained service personnel.
NOTE:
High volume usage may require more frequent maintenance.
COMPONENTS / TASKS
MAINTENANCE TYPE
DAILY
BI-WEEKLY
MONTHLY
YEARLY
AS NEEDED
PERFORMED BY OPERATOR
Grit Rollers (Media Path)
INSPECT
CLEAN
CLEAN
Ink Revolver Couplings and
Connections:
Inspection/Cleaning
EVERY
PRINTHEAD
REMOVAL
Ink Tank Contacts & Prism
(Clean)
EVERY INK
TANK INSTALL
Optical Sensors
(Media Paperpath)
CLEAN
CLEAN
CLEAN
CLEAN
CLEAN
Printhead (Manual Wiping)
WIPE
Printhead, Head Media Guide
& Lip of Capping Station
(Manual Wiping)
AFTER EVERY
PRINTHEAD
INSTALL
Residue and Debris Removal
CLEAN
CLEAN
CLEAN
CLEAN
CLEAN
Wiper Roller:
Inspection
INSPECT
INSPECT
INSPECT
Contact Service
to Replace
Waste Ink Tray
INSPECT
INSPECT
REPLACE
PERFORMED BY SERVICE TECHNICIAN
*Cutter: Inspection/Cleaning
INSPECT/
CLEAN
Ink Tank Latches/Ink Bay
INSPECT
Ink Tubing, Couplings,
Components
INSPECT
Lubrication (Service Station
Rails, Lift Arm Cams, etc..)
APPLY
Moving Parts/Motors/Gears
INSPECT
& TEST
REPLACE
Optical Sensors (Service
Station Home, Index and Lift)
INSPECT &
TEST
CLEAN
*Pen Driver PCA Contacts:
Cleaning
INSPECT &
CLEAN
INSPECT/
CLEAN AFTER
PRINTHEAD
REMOVAL
*Service Station &
Components
INSPECT
CLEAN or
REPLACE
*Wiper Roller:
Replace
INSPECT
EVERY
PRINTHEAD
REPLACEMENT
* Customer may be able to perform these tasks with proper training.
WARNING
ALWAYS POWER DOWN THE PRINTER BEFORE PERFORMING ANY MAINTENANCE; TO AVOID
SERIOUS SHOCK OR INJURY.
Содержание MACH X
Страница 124: ......
Страница 125: ...Copyright 2015 NEOPOST USA...