4.13 Timing chart of operation
109
4.13 Timing chart of operation
4.13.1 Timing chart when power supply switch on
The control power supply L1C, L2C turns on before or at the same time when the main
power supply L1, L2, and L3 turn on. If only the control power supply turn on, the servo
ready signal (RDY) is OFF.
After the main power supply turn on, at about 1.5 seconds later the servo ready signal is on
(RDY), from now can accept the servo enable signal (SON). The servo driver examines that
the SON is effective, and then the power circuit and the servomotor are active. The
servomotor is in running status. If the SON is invalid or an alarm occurs, power circuit shut
down and the servomotor is in free running state.
Содержание EP3 AC Series
Страница 1: ...Wuhan Maxsine Electric Co Ltd...
Страница 12: ...Chapter 1 Product inspection and installment 2 1 2 Product nameplate...
Страница 16: ...Chapter 1 Product inspection and installment 6...
Страница 39: ...2 5 Standard wiring diagram 29 2 5 Standard wiring diagram 2 5 1 Wiring diagram for position control...
Страница 40: ...Chapter 2 Wiring 30 2 5 2 Wiring diagram for speed or torque control...
Страница 56: ...Chapter 3 Front panel operation 46 6 Turn off and on the power supply then an operation can be performed again...
Страница 57: ...3 7 Resume the parameter default values 47 Remarks...
Страница 124: ...Chapter 4 Running 114 Remarks...
Страница 221: ...198 Chapter 8 Specifications 8 1 Types of servo driver...
Страница 231: ...8 5 Types of servo motor 8 5 Types of servo motor...
Страница 245: ...Edition antecedents Edition number Published time Modify content First edition Janunary 2013 Applies to software version...