2) Install rear housing (2) on rear cylinder.
Housing protrusion (1) is positioned at the top.
3) Install front valve plate (2) on front cylinder.
a. Install two pins in front cylinder.
b. Lubricate new O-ring with compressor oil.
Install O-ring in front cylinder.
c. Install suction reed valve (1), front valve plate (2), and discharge
reed valve (3) onto front cylinder top.
For installing positions, refer to figure.
NOTE:
Front and rear reed valves (suction and discharge) are
the same.
Front valve plate is marked “F”.
4. Pin holes
d. Lubricate gasket (1) with compressor oil. Install gasket (1) on
valve plate.
NOTE:
Front and rear gaskets are different, so do not inter-
change them. (To differentiate them, refer to description
on rear valve plate.)
Assemble gaskets so that their protruded surfaces face
upward.
4) Install front housing (1) on front cylinder and tighten five through
bolts.
a. Using a torque wrench and hexagon wrench, gradually tighten
five through bolts.
NOTE:
Housing protrusion (2) is positioned at the top.
Tightening Torque
(a): 26 N·m (2.0 kg-m, 19 lb-ft)
AIR CONDITIONING (OPTIONAL)
1B-33
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...