9) Install rocker arms, springs and rocker arm shaft as previously
outlined.
10) Install intake manifold, exhaust manifold and thermostat case.
INSTALLATION
1) Remove old gasket and oil on mating surfaces and install new
head gasket as shown in figure, that is, “TOP” mark (1) pro-
vided on gasket comes to crankshaft pulley side (2), facing up
(toward cylinder head side).
2) Check to make sure that oil jet (venturi plug) is installed and
if it is, that it is not clogged.
When installing it, be sure to tighten to specified torque.
Tightening Torque
(a): 5 N
.
m (0.5 kg-m, 4.0 lb-ft)
3) Apply engine oil to cylinder head bolts and tighten them gradu-
ally as follows.
(1) Tighten all bolts to 30 N
.
m (3.0 kg-m, 22.0 lb-ft) according
to numerical order in figure.
(2) In the same manner as in (1), tighten them to 48 N
.
m (4.8
kg-m, 35.0 lb-ft).
(3) Loosen all bolts to 0 N·m (0 kg-m, 0 lb-ft) reversing to nu-
merical order in figure.
(4) In the same manner as in (1) again, tighten them to 48 N·m
(4.8 kg-m, 35.0 lb-ft).
(5) In the same manner as in (1) again, tighten them to speci-
fied torque.
Tightening Torque
(b): 60 N
.
m (6.0 kg-m, 43.5 lb-ft)
6A1-40
ENGINE MECHANICAL (F8D ENGINE)
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...