7) Hook magnetic switch plunger (3) with drive lever and then fas-
ten magnetic switch assembly (1) with nuts (4).
8) Connect lead wire (5) as it was and then check magnetic switch
for operation.
NOTE:
Before installing nuts, make sure that plunger hook is
connected with drive lever without fail.
Face boot (2) breather down.
Upon completion of assembly, carry out PERFORMANCE TEST.
INSPECTION
PLUNGER
Inspect plunger for wear. Replace if necessary.
MAGNETIC SWITCH
Push in plunger and release it. The plunger should return quickly
to its original position. Replace if necessary.
Pull-In Coil Open Circuit Test
Check for continuity across magnetic switch ‘S’ terminal (1) and
‘M’ terminal (2). If no continuity exists, coil is open and should be
replaced.
6G-8
CRANKING SYSTEM
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...