F8D engine
1) Install new pump gasket (1) to cylinder block.
2) Install water pump (1) to cylinder block.
Tightening Torque
(a): 11 N·m (1.1 kg-m, 8.0 lb-ft)
3) After installing water pump, install rubber seal (2).
4) Install belt tensioner and timing belt and adjust timing belt ac-
cording to procedure described in item TIMING BELT AND
TENSIONER of SECTION 6A1.
5) Adjust drive belt tension.
6) Fill cooling system.
7) After installation, check each part for leakage.
6B-14
ENGINE COOLING
REQUIRED SERVICE MATERIAL
MATERIALS
USE
Ethylene glycol base coolant
(Anti-freeze/Anti-corrosion coolant)
Additive to engine cooling system for improving cooling
efficiency and for protection against rusting.
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...