ASSEMBLY
1) Fit a boot (1) on drive shaft and, fitting small diameter side of the
boot to shaft groove, fix with a boot band (2).
CAUTION:
Wash all part before installation. Wipe out boot with a
cloth.
2) Install cage (1) on drive shaft.
Diameter : A > a
CAUTION:
Install the cage directing the smaller outside diameter
side to the shaft end.
3) Install circlip (1) by using special tool.
Special Tool
(A): 09900-06107
4) Apply grease to entire surface of cage.
“A” : SUZUKI SUPER GREASE H 99000-25120
5) Insert cage into outer race (2) and fit a snap ring (1) in the groove
of outer race.
CAUTION:
Locate the opening of the snap ring “b” so that the
opening is not lined up with a ball.
FRONT DRIVE SHAFT
4-5
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...