SAFETY INFORMATION
CD25
2-26
Published 1-06-2017 Control # 579-01
2-26
4.
Connect the free end of the cable with a clamp (1) to a
good electrically conductive location on the frame.
PERSONNEL HANDLING
The American Society of Mechanical Engineers issued a
new American National Standard entitled,
Personnel Lifting
Systems,
ASME B30.23-2011:
This Volume establishes the design criteria, equip-
ment characteristics, and operational procedures
that are required when hoisting equipment within
the scope of the ASME B30 Standard is used to lift
personnel. Hoisting equipment defined by the
ASME B30 Standard is intended for material han-
dling. It is not designed, manufactured, or intended
to meet the standards for personnel handling equip-
ment, such as ANSI/SIA A92 (Aerial Platforms).
The equipment and implementation requirements
listed in this Volume are not the same as that estab-
lished for using equipment specifically designed
and manufactured for lifting personnel. Hoisting
equipment complying with the applicable Volumes
of the ASME B30 Standard shall not be used to lift
or lower personnel unless there are no less hazard-
ous alternatives to providing access to the, area
where work is to be performed. The lifting or lower-
ing of personnel using ASME B30-compliant hoist-
ing equipment is prohibited unless all applicable
requirements of this volume have been met.
This new standard is consistent with the U.S. Department of
Labor, Occupational Safety and Health Administration
(OSHA) regulations for Construction that state, in
29CFR1926.1431:
General requirements. The use of a crane or der-
rick to hoist employees on a personnel platform is
prohibited, except when the erection, use, and dis-
mantling of conventional means of reaching the
worksite, such as a personnel hoist, ladder, stair-
way, aerial lift, elevating work platform or scaffold,
would be more hazardous or is not possible
because of structural design or worksite conditions.
Additional requirements for crane operations are stated in
ASME B30.5
, Mobile and Locomotive Cranes
, ASME B30.8,
Floating Cranes and Floating Derricks,
and in
OSHA
regulations
29CFR1910.180
for General Industry
and
29CFR1926.1431
for Construction
.
Use of a Manitowoc crane to handle personnel is acceptable
provided:
•
The requirements of the applicable national, state and
local regulations and safety codes are met.
•
A determination has been made that use of a crane to
handle personnel is the least hazardous means to
perform the work.
•
The crane operator shall be qualified to operate the
specific type of hoisting equipment used in the
personnel lift.
•
The crane operator must remain at the crane controls at
all times when personnel are off the ground.
•
The crane operator and occupants have been instructed
in the recognized hazards of personnel platform lifts.
•
The crane is in proper working order.
•
The crane must be equipped with a boom angle
indicator that is visible to the crane operator.
•
The crane's
Load Chart
is affixed at the operator’s
station and readily accessible to the operator. The total
weight of the loaded personnel platform and related
rigging shall not exceed 50 percent of the rated capacity
for the radius and configuration of the crane.
•
The crane is level within one percent of level grade and
located on a firm footing. Cranes with outriggers shall
have them all deployed following manufacturer's
specifications.
•
The crane's
Operator Manual
and other operating
manuals are at the operator’s station and readily
accessible to the operator.
•
The platform meets the requirements as prescribed by
applicable standards and regulations.
•
For hoist rope suspended platforms:
-
The crane is equipped with a hook that can be
closed and locked, eliminating the throat opening.
-
The crane is equipped with a functional anti-two-
block device.
WARNING
Risk of accidents due to electric shock!
Ensure that the connections between the cable and the
clamp are electrically conductive.
Do not attach the clamp to parts that are screwed on, such
as valves, covers or similar parts.
FIGURE 2-6
Reference Only
Содержание CD25
Страница 5: ...Operator Manual CD25 R e f e r e n c e O n l y ...
Страница 6: ...R e f e r e n c e O n l y ...
Страница 14: ...TABLE OF CONTENTS CD25 OPERATOR MANUAL TOC 6 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 18: ...INTRODUCTION CD25 1 4 Published 1 06 2017 Control 579 01 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 55: ...2 37 CD25 SAFETY INFORMATION 2 Published 1 06 2017 Control 579 01 8496 1 FIGURE 2 10 R e f e r e n c e O n l y ...
Страница 66: ...SAFETY INFORMATION CD25 2 48 Published 1 06 2017 Control 579 01 2 48 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 100: ...CAPACITY CHART CD25 4 4 Published 1 06 2017 Control 579 01 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 150: ...MAINTENANCE CD25 6 40 Published 1 06 2017 Control 579 01 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 152: ...ADJUSTMENTS CD25 7 2 Published 1 06 2017 Control 579 01 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 156: ...8 4 SPECIFICATIONS CD25 Published 1 06 2017 Control 579 01 Boom angle Maximum 80 Minimum 0 R e f e r e n c e O n l y ...
Страница 159: ...R e f e r e n c e O n l y ...
Страница 160: ...R e f e r e n c e O n l y ...