Motorized Cable Reel Technical Manual
September 2021
15. Repeat action instructions 11 and 14.
The slip ring phases have been installed.
The wire phases of the reeling cable are connected to the slip rings.
16. Install the hexagon nuts, flat washers and spring rings on the threaded rod (slip ring).
17. Install the threaded rod (brush holder).
18. Slide the brass pipe over the threaded rod (brush holder).
19. Install the brush holder PE and center it (
|
20. Slide the long insulating pipe over the threaded rod (brush holder).
21. Install the brush holder phase.
22. Slide the long insulating pipe over the other threaded rod (brush holder).
23. Install the brush holder phase and center it.
24. Install the hexagon nuts, flat washers and spring rings on the threaded rods (brush holder).
25. Check the continuity of the PE connection.
26. Check the continuity of the phases and all other connections.
27. Install the covering hood on the cable enclosure.