262391
178
Revision A
Installing Primary Driveline
The primary driveline transfers power from the tractor
’
s power take-off (PTO) to the header drive gearbox. These
instructions describe the procedure for installing the driveline.
DANGER
To prevent bodily injury or death from the unexpected startup of the machine, always stop the engine and remove the
key from the ignition before leaving the operator
’
s seat.
WARNING
Exercise caution when working around the blades. Blades are sharp and can cause serious injury. Wear gloves when
handling blades.
This procedure is continued from
Removing Primary Driveline, page 177
and assumes the header is lowered to the ground
and disconnected from the tractor.
1.
Open the cutterbar doors. For instructions, refer to
Opening Cutterbar Doors, page 26
ϭϬϰϯϴϭϵ
A
B
Figure 4.181: Primary Driveline
–
View from Below
Header
2.
From below the header, install primary driveline (A) onto
the splined shaft of the header drive gearbox until collar (B)
locks onto the shaft.
NOTE:
The cutterbar and the drive gearbox support bracket are
shown transparent in the illustration.
3.
Install the driveline guard. For instructions, refer to
Installing Driveline Guards, page 176
ϭϬϰϯϴϲϴ
A
Figure 4.182: Primary Driveline Chain
4.
Reconnect driveline chain (A) to the header frame.
IMPORTANT:
Ensure chain is short enough and does
NOT
wrap around
the driveline guard.