![Lynx NGT-9000 Series Скачать руководство пользователя страница 95](http://html1.mh-extra.com/html/lynx/ngt-9000-series/ngt-9000-series_installation-manual_1953763095.webp)
Lynx NGT-9000
Installation Manual
3.7 SELECT CONFIGURATION OPTIONS
This procedure is used to configure the Lynx NGT-9000s and must be completed prior to performing the
Installation Checkout for first time installations. The Log Sheet provided in Appendix C should be filled
out in preparation for this procedure and maintained with the aircrafts permanent records.
CAUTION
A “Warning” message is shown when the user first attempts an operation
that requires confirmation from the user stating “Changes should be done
by trained service personnel”. The user will need to press the confirm
button to acknowledge this warning.
This message is to warn unauthorized or untrained personnel to stop
what they are doing before they mis-configure or damage the unit.
•
If a configuration file has already been created using the Lynx MAT Backup function, then it may be
used to load the data options. The configuration restore procedure is located in the maintenance
section of this manual.
•
Unlock codes are required to enable TAS and Diversity configuration selections. The unlock codes
are typically shipped with the unit. If the unlock codes are not included, contact L-3 Avionics
Systems Customer Service to obtain the codes.
•
If the Lynx MAT is not connected or is disconnected the left side panel color changes to a light grey
and the “Not Connected” message is displayed at the bottom of the tool screen. Re-connect by doing
the following - from the Lynx MAT panel select Connect
Z
NGT9000
Z
USB. This is required each
time the unit power is cycled.
•
Place the curser over option titles to view tool tips (not always available).
•
No configuration changes take effect until they are entered, applied, and the unit is restarted.
•
Pressing “Apply” from any setup/configuration/modify screen applies all changes from all screens.
These procedures assume the following:
•
Power is being supplied to the aircraft and unit.
•
The Lynx MAT is active on the MPC.
•
The MPC is connected to the unit via the USB interface
•
The MPC and unit are communicating.
0040-17001-01
Installation Checkout
Page 3-9
Revision A
January 15, 2015