Lucent Technologies Lineage
®
2000 400A, 60Hz Ferroresonant Rectifier J85503C-3
Issue 10 July 2000
Testing 6 - 19
Control (TR) Test
1. MCS or CCS: Place a ground on lug 29 of TB1 in the MCS or
CCS controller to turn off rectifiers 1, 2, (9 and 10 with MCS or 3
and 4 with CCS) via the TR signal. The rectifier(s) should turn off.
ECS-6U or ECS-12U: Place a ground on TB101-9 in the ECS
controller to turn off rectifiers 1, 5 and 9 via the TR signal. The
rectifier(s) should turn off.
Galaxy: Place a ground on TB3-8 in the Galaxy controller to turn
off rectifiers 1, 2, 9, 10, 17 and 18 via the TR signal. The
rectifier(s) should turn off.
2. Remove the ground. The rectifier(s) should turn on.
3. Repeat Steps 1 and 2 on:
MCS or CCS: TB1-30 to test rectifiers 3, 4, 11, and 12 (MCS) or
5, 6, 7, and 8 (CCS).
ECS-6U or ECS-12U: TB101-10 to test rectifiers 2, 6 and 10.
Galaxy: TB3-9 to test rectifiers 3, 4, 11, 12 19 and 20.
4. Repeat Steps 1 and 2 on:
MCS or CCS: TB1-31 to test rectifiers 5, 6, 13, and 14 (MCS) or
9, 10, 11 and 12 (CCS).
ECS-6U or ECS-12U: TB101-11 to test rectifiers 3, 7 and 11.
Galaxy: TB3-10 to test rectifiers 5, 6, 13, 14, 21 and 22.
5. Repeat Steps (1) and (2) on:
MCS or CCS: TB1-32 to test rectifiers 7, 8, 15, and 16 (MCS) or
13, 14, 15 and 16 (CCS).
ECS-6U or ECS-12U: TB101-12 to test rectifiers 4, 8 and 12.
Galaxy: TB3-11 to test rectifiers 7, 8, 15, 16, 23 and 24.