Page 74 - IOM / ROOFTOP BALTIC Series - 0
8
03 - E
control interface CLIMALINK / CLIMALOOK
It is possible to connect up to 12 CLIMATIC50 with
Climalook2 or 8 rooftops equipped with CLIMATIC2 and 12
with CLIMATIC 50 when Climalook 3 or Climalink is
installed.
CLIMALINK 2
This product consist in a central unit and a communication
interface.
This unit is designed to be connected to a maximum of 12
rooftops fitted with CLIMATIC 50 controllers via a RS485
interface. A connection diagram is provided in the box.
The central unit must be installed in a dry, secured loca-
tion. Once the unit is connected and powered up, it is
entirely automatic and does not require a screen a
keyboard or a mouse. After a power failure, the central unit
must be restarted using the ON/OFF button.
To avoid this Lennox recommend to connect the central
unit to a pulsating current power outlet or "UPS". Lennox
cannot be held responsible in the event this
recommendation is not acted upon.
CLIMALOOK 2
This product is identical to the CLIMALINK 2 but it is
equipped with a 15inch TFT flat screen, a mouse and a
numeric keypad to have a local display of the installation. It
can be connected to up to 12 CL50 controller via a RS485
interface.
CLIMALOOK 3
Climalook 3 provides the same features as Climalook 2 as
it can be connected to 12 rooftops equipped with CLIMATIC
50 controller but it can also be connected to 8 rooftops
fitted with CLIMATIC2 controller and KP01 board (Flexy
and Linea already on site).
NOTE: In order to connect a unit fitted with CLIMATIC2 you
must ensure that the program version is at least LF20.
Otherwise it must be upgraded to LF20 before connection
to Climalook 3
Climalook uses the internet explorer interface for local
operation. The local operating mode is completely
automatic and does not require any configuration. Like
Climalink, Climalook can receive remote queries thanks to
its internal modem and an analogue telephone line.
Climalook and Climalink do not work with ISDN telephone
lines.
NOTE : To function correctly each RTU requires an address to be
set using a KP02 (setpoint 91).
To register in the climatic the power to the climatic must be
switched off twice after entering the value.
Whenever the power is switched on it is necessary to wait 5
minutes after the welcome page is displayed to allow the
software to fully update.
CONNECTION TO CLIMATIC2 and KP01 BOARD
The connections between the units and the Climalink/
Climalook must be done using a double shielded pair of
wire (not supplied by Lennox) This cable must have
external metal braiding, and its cross-section must be at
least 0.5mm2 with a maximum of 1mm2
Each cable will be connected to the COM B port on the
KP01 Board, and particular attention must be taken to the
order of connections. The cable coming out of the KP14
with a BD9 plug at the end will be connected to the SERIAL
Port at the back of the central unit.
Details of the
connection
KP 01 board
Led flashing during
dialogue with the PC
KP 14 interface
The cable coming out of the KP14
with a BD9 plug at the end will be
connected to the SERIAL Port at
the back of the central unit.
Содержание Baltic BCK 020
Страница 1: ...BALTIC English August 2003 INSTALLATION OPERATING MAINTENANCE MANUAL ...
Страница 38: ...IOM ROOFTOP BALTIC Series 0803 E Page 37 VENTILaTION AIRFLOW BALANCING 020 025 Fig 37 ...
Страница 39: ...Page 38 IOM ROOFTOP BALTIC Series 0803 E VENTILaTION AIRFLOW BALANCING 035 030 Fig 38 ...
Страница 40: ...IOM ROOFTOP BALTIC Series 0803 E Page 39 VENTILaTION AIRFLOW BALANCING 045 050 040 Fig 39 ...
Страница 86: ...IOM ROOFTOP BALTIC Series 0803 E Page 85 CLIMATIC 50 CONTROLLER ELECTRICAL DATA wiring diagrams ...
Страница 87: ...Page 86 IOM ROOFTOP BALTIC Series 0803 E ELECTRICAL DATA wiring diagrams CLIMATIC 50 INPUT BCK BHK BGK BDK ...
Страница 101: ...Page 100 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 102: ...IOM ROOFTOP BALTIC Series 0803 E Page 101 EC declaration of conformity ...
Страница 103: ...Page 102 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 104: ...IOM ROOFTOP BALTIC Series 0803 E Page 103 EC declaration of conformity ...
Страница 105: ...Page 104 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 106: ...IOM ROOFTOP BALTIC Series 0803 E Page 105 EC declaration of conformity ...
Страница 108: ...IOM ROOFTOP BALTIC Series 0803 E Page 107 EC declaration of conformity ...
Страница 109: ...Page 108 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...