Page 30 - IOM / ROOFTOP BALTIC Series - 0
8
03 - E
COMMISSIONING report
(8) REFRIGERATION SECTION / SECTION REFRIGERATION
Outdoor Fan Motor Current / Intensité Moteurs Batterie externe:
Check Rotation
Motor 1 / Moteur 1
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Motor 2 / Moteur 2
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Compressor
Voltage/ Tension
Compresseur
.
Motor 3 / Moteur 3
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Comp1: …….. V
Motor 4 / Moteur 4
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Comp2: …….. V
Motor 5 / Moteur 5
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Comp3: …….. V
Motor 6 / Moteur 6
L1 ……..A
L2 ……..A
L3 ……A
Yes/Oui
No/ Non
Comp4: …….. V
Compressor Amps COOLING / Intensité
Compresseur MODE FROID
Pressures & Temperatures / Pressions & températures
Temperatures / Temperatures
Pressures / Pressions
Phase
1
Phase
2
Phase
3
Suction/ Asp
Disch / refoul
LP/ BP
HP / HP
Comp 1
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 2
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 3
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 4
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Check Reversing valves./
Vérifier vannes d’inversion
:
Valve1/Vanne1: Yes/Oui
No/ Non
Valve2/Vanne2: Yes/Oui
No/ Non
Valve3/Vanne3: Yes/Oui
No/ Non
Valve4/Vanne4: Yes/Oui
No/ Non
Compressor Amps HEATING / Intensité
Compresseur en Pompe à Chaleur
Pressures & Temperatures / Pressions & températures
Temperatures / Temperatures
Pressures / Pressions
Phase
1
Phase
2
Phase
3
Suction/ Asp
Disch / refoul
LP/ BP
HP / HP
Comp 1
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 2
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 3
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
Comp 4
…..… A
…..… A
…..… A
……… °C
……… °C
……… Bar
……… Bar
HP cut out / Coupure HP
……Bar
LP cut out / Coupure sécurité BP
………..…... Bar
Refrigerant charge / Charge réfrigérant
C1 : ………..kg
C2 : ………..kg
C3 : ………..kg
C4 : ………..kg
(8)ELECTRIC HEATER SECTION / SECTION RECHAUFFEUR ELECTRIQUE
Type / Type: ………………………………………………….
Serial No/ No Série.:………………………..
AMPS 1
st
stage (Baltic) / Intensité 1
er
étage (Baltic)
AMPS 2
nd
stage (Baltic) / Intensité 2
e
étage (Baltic)
1 ……………….
2 ……………….
3 ……………….
1 ……………….
2 ……………….
3 ……………….
(9) HOT WATER COIL SECTION / SECTION BATTERIE EAU CHAUDE
Check Three Way Valve Movement / Vérification Mouvement Vanne trois voies: Yes/Oui
No/ Non
(10) GAS HEATING SECTION / RAMPE GAZ
Gas Burner N°1 / Brûleur gaz N°1
Gas Burner N°2 / Brûleur gaz N°2
Size / Taille:
……………………….
Valve type / Type vanne:
…………………….
Size / Taille:
……………………….
Valve type / Type vanne:
…………………….
Pipe size/ tuyauterie:
Gas type / Type gas :
G
…….
Pipe size/ tuyauterie
Gas type / Type gas :
G
…….
Line press./ press. ligne :
………………………
Drop test / test pression
Yes/Oui
No/ Non
line press./ press. ligne :
………………………
Drop test / test pression
Yes/Oui
No/ Non
Check manifold pressure/ Pression injection:
High fire/Grande allure…….…Low fire/Petite allure………..
Check manifold pressure/ Pression injection:
High fire/Grande allure…….…... Low fire/Petite allure………..
Pressure cut out airflow press switch / Pression coupure
pressostat débit d’air : ……………………mbar /Pa
Pressure cut out airflow press switch / Pression coupure
pressostat débit d’air : ……………………mbar /Pa
Motor amps
I moteur:
……….A
Flue temp /
temp fumées
……… °C
CO2 %:
………%
CO ppm:
………%
Motor Amps
I Moteur:
……….A
Flue temp /
temp fumées
………. °C
CO2 %:
………%
CO ppm:
………%
(11) REMOTE CONTROL BMS CHECK / VERIFICATIONS BMS CONTROL A DISTANCE
Type / Type:
……………………….
Sensor type / Type Capteur:
…………………………..
KP07 KP/17 checked/ vérifiées:
Yes/Oui
No/ Non
Interconnect wiring checked:
Yes/Oui
No/ Non
Comments.....................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
Содержание Baltic BCK 020
Страница 1: ...BALTIC English August 2003 INSTALLATION OPERATING MAINTENANCE MANUAL ...
Страница 38: ...IOM ROOFTOP BALTIC Series 0803 E Page 37 VENTILaTION AIRFLOW BALANCING 020 025 Fig 37 ...
Страница 39: ...Page 38 IOM ROOFTOP BALTIC Series 0803 E VENTILaTION AIRFLOW BALANCING 035 030 Fig 38 ...
Страница 40: ...IOM ROOFTOP BALTIC Series 0803 E Page 39 VENTILaTION AIRFLOW BALANCING 045 050 040 Fig 39 ...
Страница 86: ...IOM ROOFTOP BALTIC Series 0803 E Page 85 CLIMATIC 50 CONTROLLER ELECTRICAL DATA wiring diagrams ...
Страница 87: ...Page 86 IOM ROOFTOP BALTIC Series 0803 E ELECTRICAL DATA wiring diagrams CLIMATIC 50 INPUT BCK BHK BGK BDK ...
Страница 101: ...Page 100 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 102: ...IOM ROOFTOP BALTIC Series 0803 E Page 101 EC declaration of conformity ...
Страница 103: ...Page 102 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 104: ...IOM ROOFTOP BALTIC Series 0803 E Page 103 EC declaration of conformity ...
Страница 105: ...Page 104 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...
Страница 106: ...IOM ROOFTOP BALTIC Series 0803 E Page 105 EC declaration of conformity ...
Страница 108: ...IOM ROOFTOP BALTIC Series 0803 E Page 107 EC declaration of conformity ...
Страница 109: ...Page 108 IOM ROOFTOP BALTIC Series 0803 E EC declaration of conformity ...