
3: Installation
SLB™ Branch Office Manager User Guide
34
Always connect the unit with the proper polarity at the inlet connector. See
. Failure
to do so may cause downstream hazards on connected devices.
Figure 3-5 Inlet Pin Assignment
To help protect the product from sudden, transient increases and decreases in electrical
power, use a surge suppressor, line conditioner, or uninterruptible power supply (UPS).
Do not connect or disconnect this product during an electrical storm.
Input Supply
Caution:
This SLB device may have more than one power supply source.
Disconnect all power supply sources before servicing to avoid electric
shock. Disconnect downstream device power cables prior to servicing
the downstream device.
Note:
The SLB branch office manager is intended for use in Single Phase systems.
Check nameplate ratings to assure there is no overloading of supply circuits that could affect
over current protection and supply wiring.
Grounding
1. Maintain reliable grounding of this product.
2. Pay particular attention to supply connections when connecting to power strips, rather than
directly to the branch circuit.
Fuses
For protection against fire, replace the power-input-module fuse with the same type and rating.
Rack
If rack mounted SLB branch office managers are installed in a closed or multi-unit rack assembly,
they may require further evaluation by Certification Agencies. The following items must be
considered:
Neutral
Ground
Line
Содержание 100-120 VAC SLB
Страница 114: ...8 Device Ports SLB Branch Office Manager User Guide 114 Figure 8 4 Device Ports Settings ...
Страница 131: ...8 Device Ports SLB Branch Office Manager User Guide 131 Figure 8 10 Devices Power Outlets ...
Страница 174: ...9 USB Port SLB Branch Office Manager User Guide 174 Figure 9 3 Devices USB Modem ...
Страница 227: ...12 Maintenance SLB Branch Office Manager User Guide 227 Figure 12 1 Maintenance Firmware Configurations ...