2K5
1-5-36
1-5-6 Transfer section
(1) Detaching and refitting the transfer roller unit
Follow the procedure below to replace the transfer roller unit.
Procedure
1. Open the left cover 1.
2. Unhook the hooks of the front and rear
transfer bushes and remove the transfer
roller unit.
3. Replace the transfer roller unit and install
the unit.
The front and rear transfer springs must be
firmly mounted on the holder.
Figure 1-5-67
Hook
Hook
Hook
Hook
Front transfer
spring
Rear transfer
spring
Front transfer
bush
Front transfer bush
Rear transfer
bush
Rear transfer bush
Transfer roller unit
Left cover 1
Holder
Holder
Содержание TASKALFA 300I
Страница 1: ...SERVICE MANUAL Published in February 2010 842K5111 2K5SM061 Rev 1 TASKalfa 300i ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 14: ...2K5 This page is intentionally left blank ...
Страница 22: ...2K5 1 1 8 This page is intentionally left blank ...
Страница 196: ...2K5 1 4 52 This page is intentionally left blank ...
Страница 252: ...2K5 1 5 56 This page is intentionally left blank ...
Страница 274: ...2K5 2 1 20 This page is intentionally left blank ...
Страница 280: ...2K5 2 2 6 16 Operation fan motor OFM Cools the operation section 17 Eject fan motor EFM Cools the eject section ...
Страница 310: ...2K5 2 3 28 This page is intentionally left blank ...
Страница 347: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Страница 369: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Страница 381: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Страница 391: ...INSTALLATION GUIDE FOR FAX System ...
Страница 407: ......
Страница 408: ......