
4 | Transport, installation, storage, disposal
Connecting the Rework System
4.7 Connecting the Rework System
ü
To connect the machine:
a) Remove all the accessories from the packaging, unwrap them and lay them
out.
Fig. 6:
The back side of the HR 600/2 unit
1 Power cable
7 Connection of the optional RPC camera lighting
2 Main fuse
8 Connection of the optional RPC camera
3 Fuse zone 1
9 USB port
4 Fuse zone 2
10 Nameplate
5 Maintenance unit
11 Connection of the soldering fumes aspiration
control
6 Compressed air hose
b) Connect the compressed air hose (6) to the Maintenance unit (5), by inserting
the compressed air hose all the way into the connector.
c) Connect the air hose to the on-site compressed air supply. With regard to this,
please read the section Pneumatics [
19].
d) Connect the USB cable to the USB port (9). It is not yet time to make a connec-
tion to the PC!
e) Make sure that the main switch on the front of the machine is switched to pos-
ition [OFF].
f) Compare the local power supply and the mains frequency with the specifica-
tions on the nameplate (10) of the machine.
g) Plug the power cord into the outlet.
Ersa GmbH
3BA00207_01 Operating Instructions HR 600_2 | Rev. 3
37 / 169
Содержание HR 600/2
Страница 2: ......
Страница 6: ......
Страница 16: ...1 Introduction Information about this manual Ersa GmbH 3BA00207_01 Operating Instructions HR 600_2 Rev 3 16 169...
Страница 22: ...2 Technical data Available options Ersa GmbH 3BA00207_01 Operating Instructions HR 600_2 Rev 3 22 169...
Страница 28: ...3 For your safety Retrofitting and changes Ersa GmbH 3BA00207_01 Operating Instructions HR 600_2 Rev 3 28 169...
Страница 146: ...7 Spare and wear parts Spare parts Ersa GmbH 3BA00207_01 Operating Instructions HR 600_2 Rev 3 146 169...