PAN-A
4-33
Chap
.4
Applied Oper
ation
1
Starting master-slave-control parallel operation
• To start master-slave-control parallel operation,
always follow the procedure below. Because the
slave units are under control of the master unit, if the
procedure is incorrectly observed, the slave units
may output their maximum output voltage.
1. Check that the OUTPUT switch of each unit is turned off.
2. Turn on the POWER switch of the master unit.
3. Turn on the POWER switch of each slave unit.
4. Turn the VOLTAGE control knob and the CURRENT control
knob of each slave unit fully clockwise.
• Preset the output of each slave unit to the maximum level, so
that it can follow the preset output of the master unit.
5. While presetting the LIMIT switch of the master unit, preset
the output voltage and current.
• The total output current setup value can be found by multiply-
ing the preset value of the master unit by the number of units
used for the parallel operation.
• If the limit switch of the slave unit is pressed, the current dis-
play changes to a display not related to the output current.
• If both parallel operation and remote sensing are required
when combining the PAN-A and PAN series, the error in the
current display of the PAN series used as slave units may
increase. In this case, use the slave units in sensing mode.
6. Turn on the OUTPUT switch of each slave unit.
"CC" lights up on the control panel of each slave unit, indicating
that the unit is in constant current operation mode.
CAUTION
NOTE
NOTE
Содержание PAN 110-1.5A
Страница 4: ...II PAN A...
Страница 10: ...VIII PAN A Chapter 7 Specifications Describes the electrical mechanical and general specifications of the unit...
Страница 44: ...2 12 PAN A...
Страница 106: ...4 46 PAN A...
Страница 156: ...7 26 PAN A...
Страница 159: ......