Set-up and putting into operation
5.1
General points
Please comply with the installation and operating instructions for the relevant engineering chambers (chamber
system) from Kessel AG during setting-up and putting into operation.
To avoid damage to the pump during set-up and in operation, the following points must be taken into account:
• Set-up work must be carried out by qualified members of staff and taking the safety regulations into account.
• The pump must be examined for any damage before it is set-up.
• Where level controls are used, pay attention to the minimum water cover.
• Air pockets in the pump housing and pipes must be avoided at all cost (through suitable venting devices or by
tilting the pump slightly).
• Protect the pump from frost.
• The service room must be designed for the relevant pump. This includes the possibility of setting up lifting gear
to install/dismantle the pump with which the pump’s place of installation can be reached safely.
• The lifting gear must have a maximum load-bearing capacity that lies above the combined weight of the pump
with fixtures and cables.
• The pump‘s electric cables must be routed in such a way that hazardous operation and simple assembly/
removal is possible.
• The electric cables must be correctly fastened in the service room so as to prevent them from hanging around
loosely. A cable bracket must be fitted very 2-3 m depending on the length and weight of the cables.
• Dry running is strictly forbidden. We recommend the standard settings of the Kessel level control and
corresponding control units.
Kette
Öse für
Befestigung
Pumpe
Fig. [2]
Inlet
Access
steps
Chamber cover
Upper section
Chamber
Kette
Öse für
Befestigung
Pumpe
Cable conduit
Pressure pipe
connection
Guide pipe
Base elbow
Coupling and
counterflange