Intellipuff Service Manual
Page 31 of 51
Issue D 27/02/2014
EP59-12317
Thread the 6 mm tube through the housing and set the housing down onto the
sound insulation making sure that the rubber sleeve on the pump wires is
under the cut away .
Replace 4 off 3mm x 16 Pozi screws holding the pump housing to the base
Refit the cable clamp to the top of the pump hosing but do not tighten the nut
yet
Reconnect the 12 way connector from the front part of the base unit to the
Power PCB
Reconnect the 2 way connectors to the pump and valve to the Power PCB
Reconnect the 6 mm tube to the pressure relief valve
Reconnect the 4 mm tube to the pressure relief valve.
Reconnect the 4 mm tube from the umbilical to the air filter assembly.
Make sure that all tools etc have been removed from the front and rear parts
of the unit.
Connect the 12 volt PSU to the socket on the rear unit.
Switch the power on by pressing the on/off button on the front panel
Briefly press the button at the bottom of the handset cradle.
The pump should start
Adjust the 6 mm tube in the top of the pump housing until the noise from the
pump is minimal and tighten the nut on the cable clamp using Torque Spanner
TD699 to 1.5 Nm. The nut will normally be in contact with the main body.
Connect the test gauge on the calibration unit to the system by removing the
long 4 mm tube from the air filter and reconnecting via the test gauge.