KC-P30 Charging Station
Auxiliary device
V1.03
25
© KEBA
"LG":[
{
"TM":"2019-07-01T13:22:04, 000+0000 |",
"EV":"A",
"CT":"5D091659.00000000.0001";
}
]
}|
{
"SD":
"887FABF407AC82782WWDDD2220C2D856AE0BC22364BBCC6B
ED651D1A922BADA88818C9671AFEE7094D7F536"
Description of contents
Abbr.
Designation
Description/Possible values
Device information
FV
Format and version
GI
Meter manufacturer and designa-
tion of the charging station
GS
Serial number of the meter
Where necessary, otherwise "0"
GV
Software version of the meter
Local ID of the charging session
PG
Serial number of the charging ses-
sion (pagination)
"T" + serial number per device
Log entry
TM
Time stamp
Date:Time, synchronization state
EV
Event ID
1
A, C, E, I, L, M, O, R, S, T,
B, P
CT
Error values
Signature
SD
Signing of the data record
Hash encrypted with a private key for the
data for checking with the public key
1
Event ID
Event ID
Description
A
Power failure
C
Update complete
E
Meter error
I
Update initialized
L
Memory usage (flash) in percent
At the beginning, this is specified in increments of 10 (e.g. 10%, 20%,
30%); from memory usage of 90%, it is specified in increments of one
(90%, 91%, 92%)
M
Start of commissioning mode or test mode
O
Counter overflow
R
Restart due to an update