25. Changing the wire rope number of parts
25. Changing the wire rope number of parts
(541A-0245-0E)
25-1 Wire rope standard number of parts
(T21732-034-0E)
The standard hook and number of parts of line for each boom length are as shown in the table below. If you use a non-
standard number of parts of line, observe a limit of 28.4kN (
2900kg
) on each part of wire rope.
Table for wire rope standard number of parts
・
Attach the overhoisting detector weight in the position shown in the "method of reeving" of
the "table for wire rope standard number of parts" above.
・
If the work site is below the ground, the length of the winch wire rope may become inadequate
for the boom length used. In that case, reduce the number of parts of line so that at least three
turns of the wire rope remain on the winch drum.
When hoisting from below the ground, the length of the wire rope required is equal to the
number of parts of line multiplied by the distance below the ground.
Inadequate parts of line for a given boom length can result in the hook not reaching the
desired below-ground level, which could cause the rope to start winding up on the drum in the
opposite direction and damage the wire rope, or cause the crane to tip over.
・
Always wear strong working gloves for jobs such as detaching and reeving the wire rope.
(541A-0247-3E)
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...