![Kato PREMIUM CITYRANGE CR-200RF Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900089.webp)
- 63 -
C
ol
or
m
on
itor
8. Color monitor
③
Example of setting of quad split screen
NOTE
In case of quad split screen by any other method, the setting method is the same.
(
7) Signal input screen switching
1) Camera images during signal input can be set.
The factory default setting is "VIDEO SWITCH 1".
2) When
"VIDEO SWITCH 1"
is selected under the camera trigger image switching setting
①
When a signal is input, the corresponding camera image is displayed on a full screen. When the signal is
cancelled, the previous screen is restored.
If the signal inputs 2 and 3 are entered at the same time, the image by the camera 2 is displayed on a full
screen.
②
Camera input can be switched even while the image of the signal inputs of 1 to 4 are displayed.
To switch camera input, press
▲
button on the monitor or
▲
button on the remote control.
When
▼
button is used, camera input is switched in the reverse order.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...