- 269 -
Cr
ane
op
er
ation
24. Crane operation
Before extending the boom sections 4, 5 and 6, make sure that the boom sections 2 and 3 are
fully extended.
If you extend the only boom sections 4, 5 and 6 and proceed to lift a load, the boom could break.
When you extend the only boom sections 4, 5 and 6 for periodical inspection such as greasing the
boom etc., do so with the outriggers fully extended and no suspended load.
When the boom is extended/retracted near the fully extended position of the boom sections 4, 5
and 6, sound may be emitted.
(061A-0063-1E)
・
When extending the boom, lower the hook sufficiently for prevention of overhoisting.
・
When retracting the boom from the fully extended position
(
the boom of 28.0m
), operate the
lever particularly slowly. Sudden lever operation may cause hunting. If hunting should occur,
return the control lever to the neutral position once, then retract the boom slowly.
(T217321-033-0E)
If you extend or derrick the boom while the hydraulic oil is hot and then leave it to rest, the
extended cylinder may retract as the oil cools. This is because the volume of oil has reduced and
is not a malfunction.
The degree of cylinder retraction depends on the amount of change in the oil temperature and the
cylinder stroke position and can be as much as several percent of the cylinder's stroke. This
phenomenon is most pronounced in the long telescopic cylinder or derrick cylinder and can lower
the hook position, so take care to avoid problems due to this effect. Take necessary precautions in
the following situations.
(1)
If you have to wait with a load suspended from a long boom, avoid extending the boom
further than necessary and correct the boom length
(
extend it
) from time to time.
(2)
If the boom angle is low and the load is close to the lifting capacity, correct the boom angle
(
by
derricking)
before the ACS alerts you to danger.
(T217221-032-1E)
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...