![Kato PREMIUM CITYRANGE CR-200RF Скачать руководство пользователя страница 246](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900246.webp)
- 217 -
21. Crane operation devices
Cr
ane
op
er
ation
d
ev
ice
s
(4)
Power jib derricking/lowering lever lock
This is used to lock the power jib derricking/lowering lever when it is not operated, for preventing incorrect
operation.
The power jib derricking/lowering lever is operable when the knob is pulled. It is fixed when the knob is returned.
Apply the power jib derricking/lowering lever lock only when the lever is in the neutral position.
After locking, make sure that the lever is locked.
(511A-0024-0E)
(5)
Boom extension/retraction lever
:
Push the boom extension/retraction lever downward to extend
the boom.
:
Pull the boom extension/retraction lever upward to retract the
boom.
(6)
Boom sections 4, 5 and 6 extension/retraction button
To extend/retract the boom sections 4, 5 and 6, operate the boom
extension/retraction lever or the boom extension/retraction pedal
while pressing the "boom sections 4, 5 and 6 extension/retraction
button".
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...