- 206 -
20. How to read the capacity charts
(8)
Set the "outrigger status" and "boom operation status" you are planning to use correctly. Insert the outrigger
stopper pins to confirm each outrigger extension width when you use the outriggers and check that the ACS
display matches the actual outrigger status.
Incorrect setting of the outrigger status on the working status setting screen risks crane damage
or tipping over. Insert the outrigger stopper pins to confirm each outrigger extension width and
check that the ACS display matches the actual outrigger status.
(T217161-044-1E)
Set the "boom operation status" you are planning to use on the ACS working status setting screen
correctly. Incorrect setting can result in an exaggerated lifting capacity setting which risks crane
damage or tipover.
(511A-0064-1E)
(9)
Perform the ACS preoperational checks before you start work. The ACS preoperational checks can be performed
only when all outriggers are extended fully. If you will not be able to fully extend all outriggers in the actual work
site, move the crane to a more spacious area first, extend the outriggers fully and perform the ACS preoperational
checks.
(
10
)
Before you start work, check that the key of the ACS emergency switch has been extracted. Also check that the
overhoisting emergency switch is in the "working position"
(OFF).
(11)
The ACS emergency switch operates only after an ACS automatic stop function works.
If the ACS emergency switch is switched in the safe state, the crane is stopped automatically in the dangerous
state. If the switch is turned OFF and then turned ON, the operation to the danger side can be performed slightly. If
the ACS judges that the operation is dangerous and the automatic stop function works again, the operation to the
danger side cannot be performed thereafter even if the ACS emergency switch is operated.
(12)
If the ACS announces "Danger maximum lifting capacity" during crane operation and the crane automatic stop
works with the continuous chime alarm, immediately stop operation and take actions such as derricking and
retracting the boom or lowering the lifted load to the ground while watching the safety level bar graph on the
display to return it to the green zone before you continue work.
The lifting capacity varies greatly according to the outrigger extension configuration and the
slewing direction. Therefore when you are going to slew from a zone of larger lifting capacity to
a zone of smaller capacity, work throughout within the lower capacity.
(881A-0066-1E)
(13)
When you use the outrigger control switches, the crane operation status previously set to the ACS will be canceled.
When you change the outrigger status, you must rest the new crane operation status to the ACS. The crane will not
work until the new setting on the ACS is complete.
(14)
If any error code No. or error message is displayed during crane operation or preoperational checks, or if the
problem occurs in the communication signal or circuit between the carrier and crane, stop work immediately and
contact your authorised KATO dealer to ask for advice.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...