![Kato PREMIUM CITYRANGE CR-200RF Скачать руководство пользователя страница 222](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900222.webp)
19. For safe operation
WARNING
- 193 -
Fo
r s
afe
op
er
atio
n
19-2-6 Boom extension and retraction
(0099-0018-3E)
(1)
Lower the hook sufficiently before you extend the boom.
Extending the boom can put the hook into an overhoisted
condition which causes an automatic stop.
(2)
Be careful when extending and retracting the boom with a load
suspended on it.
(3)
Do not extend the boom more than necessary
Extending the boom more than necessary does nothing but
making the deflection of load larger, reducing the rated weight
and increasing the bending load applied to the boom. This also
makes the progress of the work instable and the fuel
consumption larger.
Keep the boom length as short as practicable throughout the
working period.
(4)
Confirm the boom extension/retraction sequence
Confirm the boom extension/retraction sequence and always
control boom extension/retraction in the correct sequence. The
figures in the lifting capacity chart are set based on the condition
that the boom is extended and retracted in the correct sequence.
If the lifting operation is conducted by extending the boom in
an improper sequence, troubles such as damaged boom could be
caused.
(5)
Never use the boom to push or pull objects
If you use the top of the boom to push cargo along a truck bed
or push objects around the construction site, you will damage
the boom top. If you push or pull objects by slewing the boom,
you could bend the boom.
To move objects, you must completely hoist them clear of the
ground even if this seems time consuming. Alternatively use a
forklift or other specialist cargo handling machine. Do not use
the crane for purposes it was not designed for.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...