20. How to read the capacity charts
(
10
)
The lifting load with which you can extend or retracted the boom during searcher hook operation may become
smaller then the lifting capacity depending on the conditions such as the oil pressure, boom angle, lubricating state to
the boom, etc.
(11) In whatever working conditions the corresponding boom critical angle is shown in the chart. The crane can tip over if
the boom is lowered below the critical angle even if unloaded. Therefore, never lower the boom below these angles.
(12)
The standard parts of line for each boom length are as indicated in the chart. If you work with a non-standard
number of parts of line, do not exceed 28.4 kN
(2.9 tf)
per wire rope respectively.
(13)
High-speed winch operation should only be performed to allow descent of the hook alone. Avoid sudden lever
operation.
(14)
Crane operation is permissible up to a wind speed of 10m/s. Even in relatively light wind conditions, extra care
should be taken when handling loads presenting large wind catching areas.
(15) The boom guard must be removed during crane operation.
(16)
If you work with a load in excess of the lifting capacity or use incorrect working procedures, you are risking
damaging the crane or tipping it over. In such cases, the crane will not be guaranteed.
20-3-2 Precautions when the outriggers are not used
(T218351-038-0E)
(1)
The lifting capacity chart indicates the maximum load the crane can lift when its body is level on firm level ground
with all tires inflated to the rated pressure and suspension cylinder completely retracted. The values in the chart
include the mass of the main hook and slings.
Within the chart the figures in the area bordered with a thick line are based on structural limitations while other
figures are determined by stability limitations.
[
Rated tire pressure: 900kPa
(
9.0 kgf/cm
2
)]
(2)
The working radii are the actual values allowing for boom deflection. Therefore you must always operate the crane
on the basis of the working radius.
(3)
The lifting capacity differs between the front area capacity and the full range capacity. When slewing from the
front to the side, take care that the crane could not be over loaded.
Crane operation
Stationary crane-
on-rubber operation
Pick and carry
operation
Area
α
◦
1
1
(061A-0038-0E)
(4)
The lifting capacity of the rooster sheave is the lifting capacity of the boom minus the mass of all attached hook,
slings etc. to the boom, with an upper limit of 3,200kg.
[The hook for use with the rooster sheave is the 3.2ton hook (
mass: 60kg
) with one part of line.]
(5)
Work within the capacity indicated in the lifting capacity chart.
(6)
For stationary crane-on-rubber operation, the parking brake and brake lock device must be engaged.
(7)
For pick and carry operation, the high/low speed switch must be switched to "ON"
(low range) and the shift lever
set to speed 1.
(8)
For pick and carry operation, lower the load to just above the ground and keep your speed strictly below 2km/h to
avoid swinging the load.
Take particular care to avoid sharp turns, sudden starts and stops.
(9)
Never operate the crane during pick and carry operation. The slewing brake must be applied.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...