![Kato PREMIUM CITYRANGE CR-200RF Скачать руководство пользователя страница 247](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900247.webp)
- 218 -
21. Crane operation devices
(7)
Boom extension/retraction pedal
:
Depress the boom extension/retraction pedal forward to extend
the boom.
:
Depress the boom extension/retraction pedal backward to
retract the boom.
To extend and retract boom sections 4, 5 and 6 work the pedal
while pressing the boom sections 4, 5, 6 extension/retraction
button.
(8) Main winch lever
(9)
Auxiliary winch lever
: Move down the winch lever forward to lower the winch.
:
Pull the winch lever rearward to wind up the winch.
(
10
)
Hook displacement display setting buttons/ACS working status
setting switching buttons
1)
Pressing
(or holding down) the button on either the main or
auxiliary winch lever displays the hook movement distance for
the corresponding lever.
Pressing
(or holding down) the other button switches to
displaying the distance for the other hook, whereas pressing
(or
holding down) the same button cancels the hook displacement
display mode.
2) Twice quick press of the button switches the ACS working status
setting.
・
Boom operation
←→
Rooster sheave operation
・
Jib operation
←→
Boom with jib operation
(11)
Boom derricking/lowering lever
: Move down the boom
derricking/lowering
lever forward to
lower the boom.
:
Pull the boom derricking/lowering
lever rearward to derrick the
boom.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...