19-2-4 Boom derricking and lowering
(0099-0016-3E)
(1)
When you derrick and lower the boom, the working radius
increases as the angle of the boom decreases, increasing the risk
of tip over.
(2) Beware of overhoisting the hook
When the boom is lowered or extended, the hook is wound up,
possibly causing overhoisting and damage when the hook block
hits the boom top. Normally the overhoisting detector will act to
prevent this, but if the detector is inoperative and overhoisting
occurs, lower the hook to the proper position.
When a lifting load is overhoisted, the distance between the
load and the boom is reduced and the load can hit the boom and
damage it.
The size of the lifting load must also be taken into account.
19-2-5 Winch operation
(0099-0017-2E)
(1) Choose a hook and wire rope number of parts of line suitable
for the mass of the load from the lifting capacity chart.
(2)
When lifting the load, pause briefly when it has just left the
ground to check for safety and then continue the operation.
Содержание PREMIUM CITYRANGE CR-200RF
Страница 2: ...218711 背厚 14 5 mm 中 ...
Страница 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Страница 16: ... 14 MEMO ...
Страница 24: ... 22 MEMO ...
Страница 30: ... 4 MEMO ...
Страница 36: ... 10 MEMO ...
Страница 38: ... 12 3 General operation devices 2 Outside the cab ...
Страница 60: ... 34 MEMO ...
Страница 74: ... 48 MEMO ...
Страница 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Страница 120: ... 94 MEMO ...
Страница 129: ... 102 MEMO ...
Страница 138: ... 111 17 Drive operation devices Drive operation devices ...
Страница 139: ... 112 17 Drive operation devices ...
Страница 153: ... 126 17 Drive operation devices ...
Страница 154: ... 127 17 Drive operation devices Drive operation devices ...
Страница 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Страница 238: ... 209 21 Crane operation devices Crane operation devices ...
Страница 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Страница 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Страница 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Страница 320: ...26 Preoperational checks Pre drive checks 290 ...
Страница 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Страница 322: ...26 Preoperational checks Pre drive checks 292 ...
Страница 328: ...26 Preoperational checks Pre drive checks 298 26 2 2 Points for preoperational checks T217221 051 0E ...
Страница 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Страница 330: ...26 Preoperational checks Pre drive checks 300 ...
Страница 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Страница 332: ... 302 MEMO ...
Страница 340: ... 310 MEMO ...
Страница 342: ...899 92187110 ...