MNP37M03GBV00 Date: 24-11 Rev. 0
Page 9 of 79
To change the door advertising panel, remove the ten screws that hold the product
delivery trim to the door. To access these screws you will need to disassemble the cup
retrieval funnel guide and the transparent protective door. You will also need to remove
the right-hand vertical profile which holds the panel when you open the pushbutton
panel.
Once the panel has been removed, replace it with the new panel and follow the
same process in reverse order, replacing the side profile, product delivery trim, the
protective door and the funnel guide.
3.- Technical specifications.
•
~
Supply voltage........................220 ± 10%VAC
•
Supply frequency...................................50 – 60 Hz
•
Power consumption.................................. 1100 W
•
Water mains pressure .........................0.5 – 10 bar
•
Water circuit pressure (boiler).......................12 bar
•
Boiler power consumption ......................... 1000 W
•
Boiler capacity............................................. 370 cc
•
Height...................................................... 1825 mm
•
Width.........................................................600 mm
•
Depth ........................................................603 mm
•
Weight........................................................ 147 kg
3.1.- Initial electrical installation.
~
Prepare a 220 ± 10%VAC, 50-60Hz and 10A socket protected with an automatic
connection system. The socket should match the machine plug (European with ground
connection). Follow all Low Voltage Installation Regulations and check that ground
connection works properly once the machine has been installed.
4. - Installation and start up.
4.1. – Installation
Installation and maintenance operations should only be carried out by
qualified technical personnel.
The machine can be transported to the place where it is to be installed using a fork-
lift truck, inserting the fork under the front of the machine. In order for the machine to be
properly installed, use the adjustable legs provided in a bag inside the machine. Screw
the legs onto the four threaded fixtures located at the bottom of the machine.
i
i
Содержание COFFEEMAR G-500 V2
Страница 1: ...MNP37M03GBV00 Date 24 11 Rev 0 Page 1 of 79 INGL S COFFEEMAR G 500 V2 USER S MANUAL...
Страница 26: ...MNP37M03GBV00 Date 24 11 Rev 0 Page 26 of 79 6 3 Electrical drawings Cabinet electrical drawing...
Страница 27: ...MNP37M03GBV00 Date 24 11 Rev 0 Page 27 of 79 Door electrical drawing...