background image

© 2020, JAPAN CASH MACHINE CO., LTD.

Website: 

http://www.jcmglobal.com

UBA

 Pro Series

Universal Banknote Acceptor

Operation and Maintenance

Manual

(Revision A)

P/N 960-000211R_Rev. A

Issue #4116-SME-01-00

Содержание UBA Pro Series

Страница 1: ...2020 JAPAN CASH MACHINE CO LTD Website http www jcmglobal com UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual Revision A P N 960 000211R_Rev A Issue 4116 SME 01 00...

Страница 2: ...is publication Copyright 2020 By JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual Electrical Current Symbol Direct Current indicates Direct Current...

Страница 3: ...Specifications 1 7 Structural Specifications 1 7 Unit Dimensions 1 8 UBA Pro with Standard 500 Note Cash Box Outside Dimension 1 8 UBA Pro with Standard or ICB 900 Note Cash Box Outside Dimension 1 9...

Страница 4: ...ub Board 2 Photo Coupler Isolation Connector Pin Assignment 2 12 Sub Board 2 RS232C Connector Pin Assignment 2 13 Sub Board 2 cc Talk Connector Pin Assignment 2 14 Sub Board 2 TTL Connector Pin Assign...

Страница 5: ...9 5 WIRING DIAGRAMS 5 1 UBA Pro Wiring Diagram 5 1 6 CALIBRATION AND TESTING 6 1 Tool Requirements 6 1 Installation Procedures 6 1 Part 1 JCM Tool Suite Installation 6 1 Part 2 USB Drivers Installatio...

Страница 6: ...eration Test 6 22 PB Motor Operation Test 6 23 Centering Motor Operation Test 6 23 Stacker Motor Operation Test 6 24 Entrance Motor Operation Test Forward 6 24 Entrance Motor Operation Test Reverse 6...

Страница 7: ...d ICB Error and Reject Code Conditions A 4 Standard Error Code Conditions A 4 ICB Error Code Conditions A 6 LED Flash Reject Error Code Conditions Banknotes A 6 LED Flash Reject Error Code Conditions...

Страница 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 9: ...Pro Sensor and Roller Locations 2 18 Figure 2 17 UBA Pro Sub Board 1 Interface Circuit Schematic Diagram 1 2 19 Figure 2 18 UBA Pro Sub Board 1 Interface Circuit Schematic Diagram 2 2 20 Figure 2 19...

Страница 10: ...Removal 1 4 8 Figure 4 39 PDIC Array Removal 2 4 8 Figure 4 40 PDIC Array Removal 3 4 9 Figure 4 41 PDIC Array Removal 4 4 9 Figure 4 42 Lower BAR Sensor Removal 4 9 Figure 4 43 Slide Roller Removal 1...

Страница 11: ...6 10 Figure 6 50 Sensor Test 1 6 11 Figure 6 51 Sensor Test 2 6 11 Figure 6 52 Aging Test 6 11 Figure 6 53 DIP Switch Test 1 6 11 Figure 6 54 DIP Switch Test 2 6 11 Figure 6 55 DIP Switch Test 3 6 12...

Страница 12: ...Test Reverse 4 6 20 Figure 6 97 Sensor Test 1 6 20 Figure 6 98 Sensor Test 2 6 20 Figure 6 99 Sensor Test 3 6 20 Figure 6 100 Aging Test with Cash Box 1 6 21 Figure 6 101 Aging Test with Cash Box 2 6...

Страница 13: ...gure 6 138 Entrance and Feed Motors Simultaneous Speed Test Reverse 2 6 26 Figure 6 139 Entrance and Feed Motors Simultaneous Speed Test Reverse 3 6 26 Figure 6 140 Entrance and Feed Motors Simultaneo...

Страница 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 15: ...ub Board 2 TTL Connector Pin Assignments 2 15 Table 2 14 CN5 Bezel Connector Pin Assignments 2 15 Table 2 15 UBA Pro Sensors and Cleaning Methods 2 18 Table 6 1 List of the UBA Pro Performance Tests 6...

Страница 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 17: ...ns Unit Dimensions Technical Contact Information In order to make operating this device and navigating within this manual easier the following illustrations are used Safety Instructions need to be obs...

Страница 18: ...0 Black Standard 6 Bezel Option 0 No Bezel 1 Black 2 Green LEDs Bezel 85 Standard Installation 2 Reserved 8 Reserved 9 Reserved A Reserved B Black 2 Blue LEDs SU Installation 7 ICB Option 0 Not Suppo...

Страница 19: ...sive outside pressure on the Unit or subject it to excessive vibration during transportation 5 Check that the Transport Section and or the Cash Box does not drop off the Unit when pulling it forward a...

Страница 20: ...Acceptor Unit con tains the following primary features The UBA Pro Unit is backwards compatible with all previous UBA and iPRO Series Unit just by replacing its Acceptor Head Unit Upgrade of current U...

Страница 21: ...es a Acceptor Head Unit b Frame Unit c Bezel d Cash Box e Upper Guide Access Lever f Acceptor Head Unit Release Lever g Cash Box Handle h Centering Guide Shaft i DIP Switches Front j Status LED Orange...

Страница 22: ...Interleaved 2 of 5 Narrow Bar 0 5mm 0 6mm 0 019 0 023 in Wide Bar to Narrow Bar ratio 3 1 Characters 18 Characters Print Position Middle Divides a Ticket equally from the left right top and bottom of...

Страница 23: ...Only No Cabinet Vibration Do Not exposed to the elements including the internal Unit assemblies Table 1 6 UBA Pro Electrical Specification Measured on a new and factory default UBA Pro Unit Supply Vo...

Страница 24: ...ates the UBA Pro Unit with a Standard 500 Note Cash Box Outside Dimension Figure 1 5 UBA Pro Unit With 500 Note Cash Box Outside Dimension FG 8 90 97 104 4 3 2 5 86 49 8 27 6 6 6 6 6 6 6 6 6 6 6 6 2 2...

Страница 25: ...6 UBA Pro Unit With Standard or ICB 900 Note Cash Box Outside Dimension NOTE All dimensions in millimeter NOTE For the ICB 900 Note Box the ICB is equipped inside of the Box There is no difference in...

Страница 26: ...igure 1 7 UBA Pro Unit With ICB 500 Note Cash Box Outside Dimension NOTE All dimensions in millimeters 8 90 97 104 4 3 2 5 86 49 8 27 6 6 6 6 6 6 6 6 6 6 6 6 2 21 3 5 3 5 50 2xM3 114 278 2 21 5 267 30...

Страница 27: ...ax 44 0 190 837 7834 Unit B Third Avenue Denbigh West Business Park Bletchley Milton Keynes Buckinghamshire MK1 1DH UK E mail support jcmglobal eu Asia and Oceania JCM Gold HK Ltd Phone 852 2429 7187...

Страница 28: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 1 UBA Pro Series Universal Banknote Acceptor General Information P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 1 1 2...

Страница 29: ...the Frame in its intended mounting loca tion 3 Secure both right and left sides of the Frame into its intended location using six 6 specified Screws Figure 2 2 d1 through d6 from the out side of the...

Страница 30: ...s intended location Refer to Side Installation on page 2 1 or Rear Installation on page 2 2 4 Install the UBA Pro Unit and the Cash Box back into the Frame Bezel Installation 1 Open the UBA Pro s Cove...

Страница 31: ...xternal Harness Installation b1 b2 a Figure 2 7 Key Hole Location Figure 2 7 Key Hole Location Key Holes Figure 2 8 Key Hole Dimension Cylinder Length Figure 2 8 Key Hole Dimension Cylinder Length 19...

Страница 32: ...BIT OFF VEND 3 ACCEPT 4 ON VEND 4 INHIBIT OFF VEND 4 ACCEPT 5 ON VEND 5 INHIBIT OFF VEND 5 ACCEPT 6 ON VEND 6 INHIBIT OFF VEND 6 ACCEPT 7 ON VEND 7 INHIBIT OFF VEND 7 ACCEPT 8 OFF Not Applicable N A N...

Страница 33: ...LED Flash Reject Error Code Conditions Barcode Tickets on page A 8 Flashes OFF Error Standard Standard error occurred Refer to Standard Error Code Conditions on page A 4 Flashes ON Error Boot Program...

Страница 34: ...rical resistance of a wire Approximately 150m For 12V DC the thinner or longer wiring harness than recommended specifications may cause the UBA Pro Unit to reset caused by voltage drop Connector Housi...

Страница 35: ...GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Connection 5 12V I F Interface Power Supply 12V DC 6 No Connection 7 No Connection 8 VBUS1 USB1 Communication Vbus Signal Line 5V...

Страница 36: ...Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Res...

Страница 37: ...0 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Accepto...

Страница 38: ...O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Co...

Страница 39: ...utput is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Connection 5 12...

Страница 40: ...AE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor R...

Страница 41: ...000 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Accep...

Страница 42: ...2 22 26S 10000 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M R...

Страница 43: ...tion 7 No Connection 8 No Connection 9 No Connection 10 No Connection 11 O TTL1 OUT TTL Open Collector Output Signal Line 1 12 No Connection 13 GND SG 0V DC Power Supply 14 LED POWER LED Drive Line An...

Страница 44: ...ed Banknote Figure 2 13 b1 3 Remove the UBA Pro Unit Figure 2 13 c from the Frame Figure 2 13 d 4 Remove any jammed Banknote found in the Transport or Cash Box area Figure 2 13 b2 5 If the Banknote ja...

Страница 45: ...or Whenever Sensors Rollers or Banknote Path are dirty due to dust foreign objects or similar debris adhering to them Caution Do not use alcohol thinner or citrus based products for cleaning any Bankn...

Страница 46: ...loth cotton swab or Blow clean using non flammable Compressed Air Refer to Cleaning Procedure on page 2 17 b Centering Start Sensor c1 Validation Sensor PDIC Sensor Array c2 Validation Sensor LED Ligh...

Страница 47: ...VIN 12V I F M RESET GND GND TLP291 2R2K 1SS352 DC3 3V GND NYI 1 2 5 3 GND DC12V DC24V Interface Connector Opto GND GND Opto GND GND PC400 DC5V 100 F 4R7K NYI DC3 3V NYI PC400 DC3 3V 2R2K 1SS352 7 GND...

Страница 48: ...ull speed USB Vbus user1 USB DM user1 USB DP user1 GND 33 33 1uF TPD2E2U06 GND USB GND GND USB GND 100 8 9 10 12 GND Interface Connector USB DM user2 USB DM user2 16 DC3 3V DC5V USB2 VBUS USB DP user2...

Страница 49: ...400 DC3 3V 2R2K 1SS352 7 GND GND GND Serial IN Serial OUT Serial IN Serial OUT DOUT RIN INV EN VCC V V GND DIN ROUT FOFF FON C1 C1 C2 C2 DC3 3V GND GND GND DC3 3V GND GND GND DC3 3V DC3 3V 10K DC3 3V...

Страница 50: ...l speed USB Vbus user1 USB DM user1 USB DP user1 GND 33 33 1uF TPD2E2U06 GND USB GND GND USB GND 100 8 9 10 12 GND Interface Connector GND GND GND GND 13 cc Talk I TTL2 cc Talk I TTL2 16 GND 10K UMH3N...

Страница 51: ...DC12V D12V I TTL3 N C N C PW GND 5 6 GND DC5V GND UMH3N 0 GND DC3 3V GND UMH3N DC3 3V 0 1 2 3 4 7 8 5 6 Bezel Connector Interface Connector 8 5 Sub Board 2 19 18 17 Max100mA Max100mA N C N C 12V 12V N...

Страница 52: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 2 2 4 UBA Pro Series Universal Banknote Acceptor THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 53: ...wchart Figure 2 22 UBA Pro Initialization and Banknote Acceptance Flowchart b Initializing c Stand by d Is the Banknote unacceptable INHIBIT f External LED is ON g Banknote inserted h Take in the Bank...

Страница 54: ...ied the validation 2 times 1 g Return the Banknote i Rotate PB Unit E To E in this Flowchart l VEND Signal Output b g d e f i B E YES YES No NO a h j E m YES YES NO NO NO YES c D YES l k YES NO d Deno...

Страница 55: ...o Collecting Flowchart a Collect the Banknote into the Cash Box b Is the Cash Box full c Stop operation Detected Cash Box Full 1 B From Validation Flowchart Figure 2 23 C To Initialization Flowchart F...

Страница 56: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 2 UBA Pro Series Universal Banknote Acceptor Installation P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 2 2 8...

Страница 57: ...37 7834 Unit B Third Avenue Denbigh West Business Park Bletchley Milton Keynes Buckinghamshire MK1 1DH UK E mail support jcmglobal eu Asia and Oceania JCM GOLD HK LTD Phone 852 2429 7187 Fax 852 2929...

Страница 58: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 3 UBA Pro Series Universal Banknote Acceptor Communications P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 3 2...

Страница 59: ...river Flat Blade Screwdriver E Ring Tool Tweezer UBA Pro and Cash Box Removal To remove the UBA Pro and the Cash Box out of the Frame proceed as follows 1 Pull the Lever Figure 4 1 a to release the lo...

Страница 60: ...o 2 Screws Figure 4 7 c1 c2 and remove the Box Sensor Figure 4 7 d Sub Board Removal To remove the Sub Board proceed as follows 1 Release the six 6 Locking Tabs Figure 4 8 a1 through a6 and remove the...

Страница 61: ...as follows 1 Unplug the two 2 Connectors Figure 4 13 a1 a2 and remove the FPC Harness Figure 4 13 b as illustrated by the Arrows 2 Unplug the six 6 Connectors Figure 4 14 a1 through a6 Figure 4 9 Sub...

Страница 62: ...he Unit as illustrated 4 Remove the eight 8 Screws Figure 4 18 a1 through a8 5 Remove the CPU Board Cover Figure 4 18 b and the Waterproof Cover Figure 4 18 c Figure 4 15 Main Board Removal 3 b a6 a2...

Страница 63: ...racket Assy Figure 4 21 a 2 Remove the single 1 Screw Figure 4 22 a 3 Remove and take the Centering HP Board Fig ure 4 23 a out through the side of the Unit as illustrated by the Arrow Figure 4 19 Cen...

Страница 64: ...proceed as follows 1 Remove the two 2 Screws Figure 4 27 a1 a2 and remove the PB Motor Plate Assy Figure 4 27 b 2 Remove the two 2 Screws Figure 4 28 a1 a2 3 Slide and remove the PB Motor Harness Assy...

Страница 65: ...4 34 a1 a2 to open the Centering Mechanism in the directions indicated by Arrows before opening the Cover 3 Remove the six 6 Screws Figure 4 35 a1 through a6 and remove the Transport Gear Cover Figur...

Страница 66: ...5 Transport Motor Harness Assy Removal 3 b a1 a2 a3 a4 a6 a5 Figure 4 35 Transport Motor Harness Assy Removal 3 Figure 4 36 Transport Motor Harness Assy Removal 4 a1 a2 a6 a3 a5 a4 a7 a8 Figure 4 36 T...

Страница 67: ...Disassemble the Slide Roller Assy to remove the Slide Rollers Figure 4 44 a1 a2 Figure 4 40 PDIC Array Removal 3 b a1 a2 Figure 4 40 PDIC Array Removal 3 Figure 4 41 PDIC Array Removal 4 b a c Figure...

Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 4 UBA Pro Series Universal Banknote Acceptor Disassembly Reassembly P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 4 1 0...

Страница 69: ...ntrance Motor Encoder Sensor Transport Motor Encoder Sensor Stack Motor Encoder Sensor PB HP Sensor PB ENC Sensor Box Sensor ST HP Sensor Outside Temperature Sensor PCB Temperature Sensor Motor Temper...

Страница 70: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 5 2 UBA Pro Series Universal Banknote Acceptor THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 71: ...tion zip Application Software and extract on to the Desk top 2 Double click on Setup exe Figure 6 2 a 3 The JCM Tool Suite Standard Edition Install Shield Wizard Screen shown in Figure 6 3 will appear...

Страница 72: ...6 1 for the Tool Requirements and Har ness Connector locations 3 When the Device Driver Installation Wizard Screen Figure 6 7 appears click the Next Screen Button Figure 6 7 a to install the driver 4...

Страница 73: ...with a PC JCM Tool Suite Standard Edition The Software Program is loaded on the Unit Upgrade The Software Program is not loaded on the Unit Initial e g after replacing the CPU Board To download the So...

Страница 74: ...oftware download into the UBA Pro Unit 14 The Download Screen will display a Progress Bar during the download operation Figure 6 18 b and a Blue Text Line below the Download Screen Button will display...

Страница 75: ...sides are tightly closed and locked Sensor Calibration To calibrate the UBA Pro sensors proceed as follows 1 Remove electrical power from the UBA Pro Unit 2 Set DIP Switches as below Figure 6 23 3 Co...

Страница 76: ...until it clicks into place 17 Click the OK button Figure 6 29 a to begin the Sensor Calibration With Paper 18 4th Calibrate gain with paper through 5th Cali brate bar DA with paper calibration will au...

Страница 77: ...Cover until it clicks into place 29 Click the OK button Figure 6 35 a to begin the Sensor Calibration With Paper 30 10th Double check AD with paper through 11th Write EEPROM items will automatically r...

Страница 78: ...k the Stop Screen Button Figure 6 41 c to end the test Table 6 1 List of the UBA Pro Performance Tests Test Item Page Banknote Acceptance Test with Cash Box This test is available when the Cash Box is...

Страница 79: ...form the Acceptance Test not validating Banknotes without the Cash Box proceed as follows 1 Remove the Cash Box 2 Launch the Performance Test Program see page 6 8 3 Select NO_JUDGE_ACCEPT_TEST Figure...

Страница 80: ...Speed Test Reverse To perform the Feed Motor Speed Test in the reverse rotation proceed as follows 1 Ensure that the Cash Box is properly installed 2 Launch the Performance Test Program see page 6 8 3...

Страница 81: ...witch Test proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select DIPSWITCH_TEST Figure 6 53 a 3 Click the Start Screen Button Figure 6 53 b 4 Switch the DIP Switch 1 through 8...

Страница 82: ...1000msec 6 Click the Stop Screen Button Figure 6 57 b to end the test PB Motor Operation Time Test To perform the PB Motor Operation Time Test proceed as follows 1 Launch the Performance Test Program...

Страница 83: ...Performance Test Program see page 6 8 2 Select STACKER_MOTOR_FWD_TEST Fig ure 6 62 a 3 Click the Start Screen Button Figure 6 62 b 4 Remove the Cash Box 5 Click the OK button Figure 6 63 a to start 6...

Страница 84: ...tor Speed Test Reverse To perform the Entrance Motor Speed Test in the reverse rotation proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select ENTRY_MOTOR_REV_TEST Figure 6 68...

Страница 85: ...o perform the Speed Test of the Entrance Motor and the Feed Motor in the reverse rotation at the same time proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select ENTRY_FEED_MOT...

Страница 86: ...knote Acceptance with Cash Box Page 6 18 ON ON ON ON ON ON OFF Non Validation Banknote Acceptance without Cash Box Page 6 18 ON ON ON ON ON OFF Non Validation Banknote Reject Test with Cash Box Page 6...

Страница 87: ...IP Switches as below Figure 6 77 3 Remove the Cash Box 4 Apply electrical power 5 Confirm that the Green and Red Status LEDs are lit 6 To start the Test set the DIP Switch 8 to OFF Figure 6 79 7 Inser...

Страница 88: ...6 83 3 Remove the Cash Box 4 Apply electrical power 5 Confirm that the Green and Red Status LEDs are lit 6 To start the Test set the DIP Switch 8 to OFF Figure 6 85 7 Insert a Banknote 8 Confirm that...

Страница 89: ...tatus LEDs are lit 5 Lift up on the Upper Guide Access Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 91 7 The Rollers will start running in the forward dir...

Страница 90: ...to OFF Figure 6 99 6 Follow the each procedure below and confirm that the LED is lit as specified Figure 6 93 Feed Motor Operation Test Reverse 1 Figure 6 93 Feed Motor Operation Test Reverse 1 DIP Sw...

Страница 91: ...r detects the Banknote PB IN Sensor Green LED PB OUT Sensor Red LED PB Home Centering Home 1 DIP Switch 3 ON 2 Open the Cover 3 Move the PB Guide with your finger 4 Confirm that the Green LED is lit 5...

Страница 92: ...d Red Status LEDs are lit 5 To start the Test set the DIP Switch 8 to OFF Figure 6 112 6 The stacking operation will begin 7 Set the UBA Pro DIP Switch 8 to ON to end the test Figure 6 104 DI Figure 6...

Страница 93: ...Green and Red Status LEDs are lit 5 Lift up on the Upper Guide Access Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 119 7 The Centering Mechanism will sta...

Страница 94: ...he UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 127 7 The Rollers will start running in the forward direction when the Feed Motor functions prop erly 8 Set the UBA Pro DIP...

Страница 95: ...ccess Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 135 7 The Rollers will start running in the forward direction when the Entrance and Feed Motors functio...

Страница 96: ...est set the DIP Switch 8 to OFF Figure 6 139 7 The Rollers will start running in the reverse direction when the Entrance and Feed Motors function properly 8 Set the UBA Pro DIP Switch 8 to ON to end t...

Страница 97: ...d View UBA Pro Upper Transport Guide Exploded View UBA Pro Transport Unit Exploded View UBA Pro Middle Bracket Exploded View UBA Pro Bottom Cover Exploded View 7 EXPLODED VIEWS AND PARTS LISTS NOTE Co...

Страница 98: ...e LED 1 202274 UBA iPRO Bezel SS 8 R 82mm Black Green LED 1 202275 UBA iPRO Bezel SS A R 85mm Blue 2 Line Blue LED 1 For Standard SS installation With Relay Harness 202276 UBA iPRO Bezel SS B R 85mm G...

Страница 99: ...Guide Exploded View Figure 7 2 UBA Pro Upper Transport Guide Exploded View Figure 7 2 UBA Pro Upper Transport Guide Exploded View 101 102 103 103 104 104 104 104 105 106 107 108 109 109 110 111 112 11...

Страница 100: ...ge Kick Spring Right 1 113 280246 Transport Guide Back 1 114 274294 15 Sponge Roller 4 115 274291 Hinge Kick Spring Left 1 116 274295 FPC Holder 1 117 271602 Box Sensor Board 4116 3630 06 004x 01 1 Se...

Страница 101: ...JAPAN CASH MACHINE CO LTD 7 5 UBA Pro Transport Unit Exploded View 1 Figure 7 3 UBA Pro Transport Unit Exploded View 1 Figure 7 3 UBA Pro Transport Unit Exploded View 1 201 224 223 221 224 220 216 23...

Страница 102: ...PB Worm Gear 1 210 274246 PB Gear ENC 1 211 271599 PB ENC Home Position Board 4116 3630 06 002x 01 1 Service Part 212 274245 PB Gear M05 Z30 1 213 274276 PB Pin B 1 214 274224 PB Bracket 1 215 274288...

Страница 103: ...352 Power Supply Communication Harness 3630 05 001x 1 303 274261 CN Bracket 1 304 274239 TR Gear M1 Z24 4 305 274241 TR Gear M1 Z42 1 306 274237 TR Gear A 1 307 274238 TR Gear B 1 308 274240 TR Gear M...

Страница 104: ...405 280249 TR ST Motor ENC 1 406 274223 Open Latch R 1 407 274284 Latch Spring 1 408 274244 PB Gear M05 Z44 1 409 274289 PB Guide Spring 1 410 274225 UBA PRO PB Guide 1 411 101172 2x6 P TITE Phillips...

Страница 105: ...s Assy 4116 3630 03 002x 1 Service Part 504 234695 TR Feed Motor Pinion Gear 1 505 280249 TR Feed ST Motor ENC 1 506 274222 Open Latch L 1 507 274284 Latch Spring 1 508 144584 Bearing 1 509 058834 2x6...

Страница 106: ...s P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 0 UBA Pro Transport Unit Exploded View 5 Figure 7 7 UBA Pro Transport Unit Exploded View Figure 7 7 UBA Pro Transport Unit Exploded View 5 60...

Страница 107: ...Board 4116 3630 06 003x 01 1 Service Part 606 274233 Centering Cover 1 607 280995 Centering Spring 1 608 271601 BAR Sensor 4116 3630 06 005x 01 1 Service Part Lower Barcode Sensor 609 274217 Light Gu...

Страница 108: ...Ref No EDP No Description Qty Remark 701 280244 TR Guide Middle 1 702 274268 TR Drive Shaft 4 703 274273 ENT Roller Shaft 1 704 274253 TR Drive Roller 8 705 274251 Slide Roller Gear 1 706 274254 Slid...

Страница 109: ...7 P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 3 UBA Pro Middle Bracket Exploded View Figure 7 9 UBA Pro Middle Bracket Figure 7 9 UBA Pro Middle Bracket Exploded View 813 810 808 807 813...

Страница 110: ...ket 1 806 274274 Entrance Gear Shaft 2 807 274215 Light Guide A 2 808 274216 Light Guide B 2 809 274249 Entrance Gear B 1 810 274248 Entrance Gear A 1 811 274250 Entrance Gear M08 Z21 1 812 274262 Cen...

Страница 111: ...EDP No Description Qty Remark 901 280248 Bottom Cover 1 902 274265 FG Plate 1 903 274219 Light Guide E 1 904 274266 Release Lever Plate 2 905 274229 Release Lever 1 906 274286 Release Lever Spring 2 9...

Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 7 UBA Pro Series Universal Banknote Acceptor Exploded Views and Parts Lists P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 6...

Страница 113: ...View illustrations of 7 1 F Faults Table Listing of A 1 Flowcharts operational 2 25 I Installation steps required for 2 1 N Navigation within manual procedure for 1 1 P PC Calibration Preparation for...

Страница 114: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 8 1 8 Section 8 UBA Pro Series Universal Banknote Acceptor Index THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 115: ...of the failure execute the Performance Test perform a Sensor readjustment and then repair the Unit by replacing any appropriate parts deemed necessary Fault Table Listings Table A 1 through Table A 3...

Страница 116: ...rn the Power OFF and ON again The Host Machine should send a Reset Command to reinitialize the unit If power cannot be applied use a Hex Nut Driver to open the Upper Guide and manually reset the Guide...

Страница 117: ...tch failure Refer to Sensor Calibration on page 6 5 regarding DIP Switch settings Refer to Performance Test Using a PC on page 6 8 or Performance Test without a PC on page 6 16 of this Manual and cond...

Страница 118: ...ten into the ROM correctly or cannot be read Re download the Program Check that the relative parts are properly assembled and or Harness are connected CPU Circuit Board ON Flashes 4 EEPROM Error EEPRO...

Страница 119: ...ry Motor Encoder OFF Flashes 6 Transport Motor Lock Up Motor locked while transporting a Banknote Firmly re seat the Cash Box Check that the relative parts are properly assembled and or Harness are co...

Страница 120: ...heck that the ICB settings are properly set Firmly re seat the Intelligent Cash Box Cash Box Table A 6 LED Flash Reject Error Codes For Banknotes Green LED Red LED Reject Errors Banknote Solutions Rel...

Страница 121: ...ror occurs Flashes 13 OFF Banknote Length Abnormal The Line Sensors calculated a Banknote length longer or shorter than the specified value Check that the relative parts are properly assembled and or...

Страница 122: ...r more than its Settings The number of Barcode Ticket s characters does not match its settings Check that a proper Barcode Ticket is used Check that the Ticket is not damaged or dirty Check that the r...

Страница 123: ...9 OFF Upside Down Insertion A Barcode Ticket is inserted upside down Insert a Barcode Ticket in an proper direction The Barcode Ticket insertion direction Flashes 10 OFF Barcode Ticket Length Abnorma...

Страница 124: ...tion Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or dirty Refer Reference Paper Handling on page A 14 Check that the relative part is properly assembled an...

Страница 125: ...ct Reference Paper is placed in a proper direction Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or dirty Refer Reference Paper Handling on page A 14 Check t...

Страница 126: ...0 Calibration Program process failed Check that a correct Reference Paper is placed in a proper direction Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or di...

Страница 127: ...0 dll_gre_ref 0000 0000 0000 0200 dc_redr_ref 0000 0000 0000 0400 drr_gre_ref 0000 0000 0000 0800 ull_ore_ref 0000 0000 0000 1000 ul_blu_ref 0000 0000 0000 2000 uc_redl_ref 0000 0000 0000 4000 ur_blu_...

Страница 128: ...s may occur when using Reference Paper that has been used for calibrating more than 400 times Table A 11 Barcode Sensor Calibration Error Codes Sensor Error Code Solutions Relative Parts Sensors Upper...

Страница 129: ...otes Bezels are available in different shapes and sizes in order to accommodate Banknotes of different widths and different stacking configura tions 1 2 C 4 Checksum a numerical value assigned to a da...

Страница 130: ...8 Limited Power Source an electronic circuit designed to prevent damage to a Power Supply in the event a short circuit occurs 1 3 P 9 Pictograph small internationally recognized safety and attention s...

Страница 131: ...UBA Pro Series Universal Banknote Acceptor P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD...

Страница 132: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Issue 4116 SME 01 00...

Отзывы: