background image

Stargel 4 

- 17 -

Stargel 4 - 2018/03 - Rev. 00

EN

3.5 CLEANING

Eliminate dust from your machine and remove the protective product which was spread on it 

before delivery.

Use a soft cloth and water, with addition of a mild soap-detergent if necessary.

WARNING 

Avoid using solvents, alcohol or detergents that could damage 

 

machine parts or pollute the functional production parts.

3.6 TOP-UPS

Motor installed in the machine is of the type with lubrication for life; no action of checking/

replacing or topping up is necessary.

Gas filling necessary to the circuit is carried out at 

ICETEAM 1927 

factory during the machine 

post production testing; top-ups or filling are not required if the machine is new.

If any gas top-up or filling becomes necessary, this must be made solely by qualified engineers, 

able to determine the reason of such occurrence.

3.7  MACHINE TESTING

A post-production test is carried out on the machine at 

ICETEAM 1927

 premises; the required 

operational and production functions are inspected and verified.

Machine test at the end user's premises must be carried out by authorized technical personnel or 

by one of 

ICETEAM 1927

 engineers.

After positioning the machine and connecting it properly to the supply lines, proceed with the 

operations related to the functional check and with the operating test of the machine.

Содержание ICETEAM 1927 STARGEL 4

Страница 1: ...TE OF CHARACTERISTICS Code IC193 009922_00 Italian Gelato Concepts Pty Limited Unit 1 37 Mortimer Road Acacia Ridge Qld 4110 Bris Office 61 0 7 3162 7724 Syd Office 61 0 2 8311 9701 Email info italian...

Страница 2: ...smitted transcribed filed in a data retrieval system or translated into other languages without the prior written permission of ICETEAM 1927 The purchaser has the right to reprint it for his own offic...

Страница 3: ...TA 11 2 1 2 CUSTOMER USER IDENTIFICATION DATA 11 2 1 3 INFORMATION ON MAINTENANCE SERVICE 11 2 1 4 INFORMATION FOR USERS 11 2 2 INFORMATION ABOUT THE MACHINE 12 2 2 1 GENERAL INFORMATION 12 2 2 2 TECH...

Страница 4: ...SASSEMBLY CLEANING AND REASSEMBLY OF PARTS IN CONTACT WITH THE PRODUCT 6 1 GENERAL INFORMATION 29 6 2 WASHING CONDITIONS 29 6 3 TIPS 29 6 4 HOW TO USE CLEANING SANITIZING SOLUTION 30 6 5 CLEANING 30 6...

Страница 5: ...A section is the part of the manual identifying a specific topic related to a machine part Chapter A chapter is that part of a section describing an assembly or concept relevant to a machine part Sub...

Страница 6: ...ROTECTION DEVICES This symbol on the side means that the operator must use personal protection against an implicit risk of accident QUALIFICATION OF THE PERSONNEL SYMBOLS The personnel allowed to oper...

Страница 7: ...of the personnel symbols NOTE According to the standard in force a QUALIFIED ENGINEER is a person who thanks to training experience and education knowledge of rules prescriptions and interventions on...

Страница 8: ...8 Stargel 4 Stargel 4 2018 03 Rev 00 EN...

Страница 9: ...chine weight or lifter design characteristics are not adequate e g short forks Non conforming or worn ropes or cables 1 2 PACKAGING OPENING Use suitable tools to open the wooden protection packaging 1...

Страница 10: ...006 66 EC on batteries and accumulators and waste batteries and accumulators and 2002 96 EC also known as WEEE the presence of the symbol on the side of the product or packaging means that the product...

Страница 11: ...he machine manufacturer can be contacted for any explanation and information about the machine operation or any modifications aimed at improving the machine s efficiency In case of need please call th...

Страница 12: ...demanding ones Any saving made to the prejudice of quality will surely result into a loss much bigger than the saving itself Bearing in mind the above statements please take heed of the following sug...

Страница 13: ...se in volume over run desired Other supply voltage ratings are available For specific values refer to the identification plate applied to the machine and on the first page of this manual MODEL Hourly...

Страница 14: ...erature in C 10 C Max air temperature in C 43 C Min water temperature 10 C Max water temperature 30 C Min water pressure 1 bar 0 1 MPa Max water pressure 5 bar 0 5 MPa Max air relative humidity 85 Any...

Страница 15: ...der to allow free air circulation around the condenser NOTE An insufficient air circulation affects operation and output capacity of the machine 3 3 MACHINE WITH WATER COOLED CONDENSER Machines with w...

Страница 16: ...th power cable in case of three phase machine with neutral the blue conductor of the power supply cable must be connected to the system neutral WARNINGS The machine is fitted with an electric supply c...

Страница 17: ...out at ICETEAM 1927 factory during the machine post production testing top ups or filling are not required if the machine is new If any gas top up or filling becomes necessary this must be made solely...

Страница 18: ...18 Stargel 4 Stargel 4 2018 03 Rev 00 EN...

Страница 19: ...illed personnel should be assigned to electrical equipment This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experien...

Страница 20: ...turn on Press on the relevant keys to change Mixing speed STOP stargel 4 STOP stargel 4 STOP stargel 4 INCREASE Button This button increases the values that can be edited both for Programming and for...

Страница 21: ...he display shows EXTRACTION Timer 05 00 SPEED7 Mixing at speed 7 programmable at step U11 is activated Extraction function can be activated only from Freezing function and not from Stop Mixing time du...

Страница 22: ...last digit refers to the speed set for beater By pressing Freezing key Increase and Decrease LEDs turn on and it is possible to edit the consistency Set editable with Increase and Decrease keys within...

Страница 23: ...tent By selecting a Granita cycle when the recipe starts Increase and Decrease LEDs turn on and the user can select the sugar content for his her Granita The initial display will read GRANITA Sugar 15...

Страница 24: ...ref 3 To open Push lever towards the front side and pull it to the right To close Close spigot door move spigot locking lever to the left and lower it 4 3 1 Ice cream extraction When freezing cycle is...

Страница 25: ...ay of the month dd 1 31 U05 Month mm 1 12 U06 Year yyyy 2000 2099 U07 Language Ita Eng Fra Deu no Ita Deu ENG U10 Temp Backlight min 0 60 03 U11 Extr speed 1 GS speed Granita no 1 7 GS 07 U12 Extr spe...

Страница 26: ...T 4 6 PROCESS ENABLE DISABLE To disable processes Select the process as if it had to be run when the name of the cycle to be disabled is displayed press and hold the Freezing button until the selected...

Страница 27: ...the circuit cooling compressor in case of water shortage in the circuit itself water condensing or lack of air circulation around the condenser air condensing The reset is automatic WARNING If the co...

Страница 28: ...m triggers machine Stop and is automatically reset when spigot door is closed Pressure Switch Safety pressure switch tripping This alarm disables the compressor If pressure switch trips 3 times in a r...

Страница 29: ...t solution to wash the parts Manually wash the parts in water max 60 C using a non aggressive detergent and the cleaning brushes supplied as standard Use drinking water bacteriologically pure to rinse...

Страница 30: ...g sanitizing by soaking Remove larger residues by hand Remove finer residues with a jet of water Immerse the parts to be cleaned into the solution Let the solution react for the time indicated on the...

Страница 31: ...damage the beater WARNING Use sanitizing solution to clean at the end of every working day 6 7 1 Seal check Upon seal removal check it for any damage If it is not damaged it can be used again after t...

Страница 32: ...pletely drain all sanitizing solution from cylinder WARNING Do not touch the sanitized parts with hands napkins or else WARNING Before starting again with production rinse thoroughly with water only i...

Страница 33: ...f parts in contact with the product replacing of seal disassembling of beater assemblies are to be carried out at the end of the working day so as to speed up maintenance operations required Below is...

Страница 34: ...l and use personal protective equipment in order to avoid accidents wear protective goggles WARNING Never use sharp metal objects to carry out this operation the correct operation of a refrigeration s...

Страница 35: ...4 2018 03 Rev 00 EN 7 5 SUPPLIED SPARE PARTS TABLES Description Position Beater seal 28 O Ring puller 72 Spigot door seal 291 Seal 304 Brush fine 772 Petrol gel tube 830 Cleaning spatula 840 830 840...

Страница 36: ...36 Stargel 4 Stargel 4 2018 03 Rev 00 EN...

Страница 37: ...lown a Open the condensation water shut off valve Make sure the rubber pipe is not squashed or bent b Make sure the rear side of the machine has a distance of at least cm 50 from the wall Remove any r...

Страница 38: ...ed a Check and proceed as necessary a Improve preparation procedure by sanitizing all the containers spoons etc and have the mix analyzed before it is put into the machine b Empty the machine and wash...

Отзывы: