Hardware Installations and Upgrades
60
Intel
®
Server Chassis P4000M Service Guide
Figure 97. Removing Fixed Power Supply
Installing the Fixed Power Supply
1. Insert new fixed power supply and rotate the power supply locking device clockwise (see letter
A
and
B
).
Figure 98. Installing Fixed Power Supply
2. Reconnect power cables to other chassis components as appropriate.
3. Install the air duct. For instructions, see “Installing the Airduct”.
4. Install the chassis cover. For instructions, see “Installing the Chassis Cover”.
5. Plug all peripheral devices and the AC power cable into the server.
6. Power up the server.