
P
e
rf
o
rm
a
S
e
q
u
e
n
c
in
g
R
u
n
20
Part # 15050091 Rev. C
Sequencing Workflow
Prepare the flow cell and reagents for the run.
See
Flow Cell and Reagent Preparation
Using the prompts on the control software interface, enter run parameters.
Weigh reagents. Load SBS reagents for Read 1 and Read 2, indexing
reagents (if applicable), and paired-end reagents.
With a used flow cell, confirm proper flow.
Prime SBS reagents and measure priming waste.
Load a clustered HiSeq X flow cell, and confirm proper flow.
Start the sequencing run.
[Optional]
After cycle 2, inspect the First Base Report and then continue
Read 1.
When the run is complete, unload and weigh reagents.
Perform an instrument maintenance wash.