
Attention:
A filler panel should be removed only when being replaced with a
port blade or new filler panel. Any slot that is not occupied by a port blade
should be occupied by a filler panel to ensure correct cooling of the chassis and
protection from dust.
3.
Remove the filler panel or existing port blade. Refer to “Removing a filler
panel” on page 75 or “Removing a blade” on page 72.
4.
Follow the instructions for “Installing a blade” on page 74.
5.
Follow the instructions for “Removing and installing transceivers” on page 96.
6.
Install, group and route the cables as desired. See “Managing cables” on page
40 for additional cabling instructions.
Attention:
Do not route cables in front of the exhaust vent, which is located at
the top on the port side of the chassis.
7.
Verify the installation (see the appropriate section of Chapter 4, “Monitoring
system components,” on page 47). For information about how to check the
status of hardware components using the CLI, see the
Fabric OS Administrator's
Guide
, which is located on the product documentation CD.
8.
Reinstall the chassis door. See “Removing and installing the chassis door” on
page 69.
FC3880 - Installing an FCOE10-24 blade
This feature can be installed while the SAN768B is operational.
Attention:
This blade cannot be used in the same chassis with an FC8-64 high
density port blade or the FR4-18i, FX8-24, or FS8-18 application blades.
Attention:
Follow these precautions for all procedures in this section to avoid
damaging the port blades or chassis:
v
Wear a grounded ESD strap when handling a port blade (see “ESD precautions”
on page xxi).
v
Carefully remove the protective strip (if any) covering the blade connectors
before installing any blades.
v
Do not force the port blade installation. If the port blade does not slide in easily,
ensure that it is correctly aligned inside the rail guides before continuing.
Installing a port blade with incorrect alignment damages both the chassis and
the replacement part.
v
Hold the port blade by the edges of the metal pan. Do not use the ejectors to
hold a port blade.
v
Disassembling any part of a port blade voids the part warranty and regulatory
certifications. There are no user-serviceable parts inside the port blade.
Time required
Less than 20 minutes.
Items required
v
ESD (electrostatic discharge) grounding strap
v
Workstation computer
v
Port blade
v
Phillips screwdriver
v
SFP+ transceivers (as needed)
v
Optical cables (as needed)
Chapter 6. Installing new features
129
|
Содержание SAN768B
Страница 2: ......
Страница 8: ...vi SAN768B Installation Service and User Guide ...
Страница 12: ...x SAN768B Installation Service and User Guide ...
Страница 14: ...xii SAN768B Installation Service and User Guide ...
Страница 16: ...xiv SAN768B Installation Service and User Guide ...
Страница 28: ...xxvi SAN768B Installation Service and User Guide ...
Страница 32: ...xxx SAN768B Installation Service and User Guide ...
Страница 42: ...10 SAN768B Installation Service and User Guide ...
Страница 62: ...30 SAN768B Installation Service and User Guide ...
Страница 78: ...46 SAN768B Installation Service and User Guide ...
Страница 100: ...68 SAN768B Installation Service and User Guide ...
Страница 154: ...122 SAN768B Installation Service and User Guide ...
Страница 178: ...146 SAN768B Installation Service and User Guide ...
Страница 184: ...152 SAN768B Installation Service and User Guide ...
Страница 202: ...170 SAN768B Installation Service and User Guide ...
Страница 207: ......
Страница 208: ... Part Number 45W8666 Printed in USA GA32 0574 05 1P P N 45W8666 ...