
339
Part 4 Commands
(2) Positioning on the load coordinate system
Perform positioning after selecting a desired load coordinate system.
Use a SLWK command to select a load coordinate system number in a SEL program.
The selected load coordinate system number will remain valid after the program ends, and even
after reconnection of power if a system-memory backup battery is installed.
[1] When positioning to position Nos. 5 and 6 in PTP mode on load coordinate system No. 1
Program example
:
:
:
SLWK
1
Select load coordinate
system No. 1.
SLTL
0
Select tool coordinate
system No. 0.
PTPR
Specify the right arm as the
PTP target arm system.
MOVP
5
Move to position No. 5.
MOVP
6
Move to position No. 6.
:
:
:
The R-axis position will be as shown in the
figure at left (top view).
The Z-axis position will be as follows:
Position No. 5: Zb = 0
Position No. 6: Zb = 20
Position No. 5
Position No. 6
200
Yw1
Xw1
50
D-cut surface
of R-axis
Position No. 6
Position No. 5
Yw1
Xw1
30
50
Yb
Xb
40
200
340
Part 4 Commands
[2] When positioning to position Nos. 5 and 6 in PTP mode on load coordinate system No. 2
Program example
:
:
:
SLWK
2
Select load coordinate
system No. 2.
SLTL
0
Select tool coordinate
system No. 0.
PTPR
Specify the right arm as the
PTP target arm system.
MOVP
5
Move to position No. 5.
MOVP
6
Move to position No. 6.
:
:
:
The R-axis position will be as shown in the
figure at left (top view).
The Z-axis position will be as follows:
Position No. 5: Zb = 25
Position No. 6: Zb = 45
Position No. 6
Position No. 5
200
Yw2
Xw2
50
D-cut surface of R-axis
Position No. 6
Position No. 5
Yw2
Xw2
–20
50
Yb
Xb
40
200
(- direction)
342
Содержание X-SEL PX
Страница 1: ...Operation ManualSeventh Edition X SEL Controller PX QX Type Tenth Edition ...
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 39: ...15 Part 1 Installation Reference Circuit Diagram Surge absorber Solenoid valve Controller 0 V 15 ...
Страница 410: ...383 Appendix 386 ...
Страница 452: ...425 Appendix 5 428 ...
Страница 559: ......