
4. Appendix
198
[17] Upon establishment of link, the LEDs on the PLC and controller change their statuses as follows:
LED statuses on PLC
LED statuses on Controller
LED
Status
LED
Status
MS
Steady green light
MS
Steady green light
NS
Steady green light
NS
Steady green light
COMM
Steady orange light
Link/Activity
Blinking green light
100M
Steady orange light
10M Unlit
Содержание acon
Страница 1: ...EtherNet IP IAI America Inc Operation Manual Second Edition ACON PCON SCON CA ...
Страница 2: ......
Страница 4: ......
Страница 197: ...4 Appendix 191 PLC s IP Address Controller s IP Address ...
Страница 214: ......
Страница 215: ......