57
Chapter 3: Connect the machine, fill and prepare for the
required application
-
Power connection
-
Start up
-
Connecting an externally closed application (reactor)
-
Switching on the temperature control unit
-
Setting the over-temperature (OT) switch
-
Setting the level indicator with capacitive level identification (for chillers only)
-
Setting set-point limits
-
Entering a set-point
-
Starting temperature control
-
Ending temperature control
-
Filling and air purging an externally closed system
-
Draining the machine and an externally closed application
-
Changing thermal fluid / internal cleaning