Figure 6-4
Taking out industrial connectors
Step 2
Lay out the industrial connectors and cables on the cabinet top, and reinstall the rodent-proof
mesh.
Cut the rodent-proof mesh based on the cable thickness using diagonal pliers. If the opening is
too large, unwanted things may fall into the cabinet through the opening.
Figure 6-5
Laying out industrial connectors and cables
----End