11 Installing Cable Troughs and Cable Trays
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
151
11
Installing Cable Troughs and Cable
Trays
11.1 (Optional) Installing Cable Troughs
In the scenario with a smart busway, only weak-current cable troughs need to be installed.
11.1.1 (Optional) Installing a New Main Way
For detailed operations, see the documentation delivered with the equipment or obtain the
documentation by referring to the "Reference Documentation" section.
11.1.2 Installing Cable Troughs (600 mm or 800 mm Wide)
Context
Install 600 mm wide cable troughs on the top of 600 mm wide cabinets. Install one
strong-current cable trough and one weak-current cable trough on the top of every
cabinet.
Install 800 mm wide cable troughs on the top of 800 mm wide cabinets. Install one
strong-current cable trough and one weak-current cable trough on the top of every
cabinet.
Install two cable troughs on the top of PDCs first, and then install cable troughs on the
top of other cabinets along the aisle in sequence.
shows a 600 mm wide cable trough. Its BOM number is 21501142.
The BOM number of an 800 mm wide cable trough is 21501140.